SWT301 P2 EXAM QUESTIONS AND
ANSWERS
Which of the following is not a type of incremental testing approach?
Select one:
a. Bottom up
b. Big-bang
c. Functional incrementation.
d. Top down - Correct Answers -B
Exit Criteria may consist of
Select one or more:
a. Estimates of Defect density or reliability measures.
b. Residual risk such as defects not fixed or lack of test coverage in certain areas
c. Verifying the Test Environment.
d. Thoroughness measures , such as coverage of code, functionality or risk - Correct
Answers -ABD
Which of the following helps in monitoring the Test Progress
Select one or more:
a. The size of the testing Team and skills of the engineers
b. Defect Information e.g. defect density, defects found and fixed
c. Percentage of Test Case Execution
d. Percentage of work done in test environment preparation. - Correct Answers -BCD
When what is visible to end-users is a deviation from the specific or expected behavior,
this is called:
Select one:
a. a failure
b. a defect
c. a fault
d. a mistake
e. an error - Correct Answers -A
Regression testing should be performed:
Select one:
a. every week
b. when the project manager says
c. after the software/environment has changed
, d. as often as possible - Correct Answers -C
Testing should be stopped when:
Select one:
a. time has run out
b. all the planned tests have been run
c. all faults have been fixed correctly
d. it depends on the risks for the system being tested - Correct Answers -D
The selection of a test approach should consider the context
Select one or more:
a. Risk of Failure of the Project, hazards to the product and risks of product failure to
humans
b. Skills and experience of the people in the proposed technique, tools and methods
c. The size of the testing Team
d. The objective of the testing endeavor and the mission of the testing team. - Correct
Answers -ABD
In case of Large Systems
Select one:
a. Testing should be on the basis of Risk
b. Test Cases written by good test engineers should be executed.
c. Only Good Test Cases should be executed.
d. Only few tests should be run - Correct Answers -A
The Provision and Management of a controlled library containing all the configurations
items is called as
Select one:
a. Configuration Identification
b. Configuration Identification
c. Status Accounting
d. Configuration Control - Correct Answers -D
IEEE 829 test plan documentation standard contains all of the following except:
Select one:
a. test tasks
b. test environment
c. test items
d. test deliverables
e. test specification - Correct Answers -E
Order numbers on a stock control system can range between 10000 and 99999
inclusive. Which of the following inputs might be a result of designing tests for only valid
equivalence classes and valid boundaries?
Select one:
a. 10000, 50000, 99999
ANSWERS
Which of the following is not a type of incremental testing approach?
Select one:
a. Bottom up
b. Big-bang
c. Functional incrementation.
d. Top down - Correct Answers -B
Exit Criteria may consist of
Select one or more:
a. Estimates of Defect density or reliability measures.
b. Residual risk such as defects not fixed or lack of test coverage in certain areas
c. Verifying the Test Environment.
d. Thoroughness measures , such as coverage of code, functionality or risk - Correct
Answers -ABD
Which of the following helps in monitoring the Test Progress
Select one or more:
a. The size of the testing Team and skills of the engineers
b. Defect Information e.g. defect density, defects found and fixed
c. Percentage of Test Case Execution
d. Percentage of work done in test environment preparation. - Correct Answers -BCD
When what is visible to end-users is a deviation from the specific or expected behavior,
this is called:
Select one:
a. a failure
b. a defect
c. a fault
d. a mistake
e. an error - Correct Answers -A
Regression testing should be performed:
Select one:
a. every week
b. when the project manager says
c. after the software/environment has changed
, d. as often as possible - Correct Answers -C
Testing should be stopped when:
Select one:
a. time has run out
b. all the planned tests have been run
c. all faults have been fixed correctly
d. it depends on the risks for the system being tested - Correct Answers -D
The selection of a test approach should consider the context
Select one or more:
a. Risk of Failure of the Project, hazards to the product and risks of product failure to
humans
b. Skills and experience of the people in the proposed technique, tools and methods
c. The size of the testing Team
d. The objective of the testing endeavor and the mission of the testing team. - Correct
Answers -ABD
In case of Large Systems
Select one:
a. Testing should be on the basis of Risk
b. Test Cases written by good test engineers should be executed.
c. Only Good Test Cases should be executed.
d. Only few tests should be run - Correct Answers -A
The Provision and Management of a controlled library containing all the configurations
items is called as
Select one:
a. Configuration Identification
b. Configuration Identification
c. Status Accounting
d. Configuration Control - Correct Answers -D
IEEE 829 test plan documentation standard contains all of the following except:
Select one:
a. test tasks
b. test environment
c. test items
d. test deliverables
e. test specification - Correct Answers -E
Order numbers on a stock control system can range between 10000 and 99999
inclusive. Which of the following inputs might be a result of designing tests for only valid
equivalence classes and valid boundaries?
Select one:
a. 10000, 50000, 99999