Cost of the reviews will not include.
A. Review process itself
B. Metrics analysis
C. Tool support.
D. Process improvement. - Correct Answers -C
Regression testing always
involves
A. Testing whether a known software fault been fixed.
B. Executing a large number of different tests.
C. Testing whether modifications have introduced adverse side effects.
D. Using a test automation tool. - Correct Answers -C
Capture and replay facilities are least likely to be used to _______
A. Performance testing
B. Recovery testing
C. GUI testing
D. User requirements. - Correct Answers -D
Which tool will be used to test the flag memory leaks and unassigned pointers
A. Dynamic analysis tool
B. Static Analysis tool.
C. Maintenance tool.
D. Configuration tool. - Correct Answers -A
Cyclomatic complexity is used to calculate
A. Number of independent paths in the basis set of a program
B. Number of binary decisions + 1
C. Number bound for the number of tests that must be conducted to ensure that all
statements have been executed at least once
D. Number of branches and decisions - Correct Answers -B
,Which of the following is not included in Test Plan.
A. Features to be tested.
B. Environmental needs.
C. Suspension criteria.
D. Expected results. - Correct Answers -D
Software quality is not relevant to _______
A. Correctness
B. Usability
C. Viability
D. Reusability. - Correct Answers -C
Match the following:
1. Test estimation
2. Test control
3. Test monitoring
a. Measures of tracking process
b. Effort required to perform activities
c. Reallocation of resources
A. 1-b, 2-c, 3-a
B. 1-b, 2-a, 3-c
C. 1-c, 2-a, 3-b
D. 1-a, 2-b, 3-c
<<<<<< =================== >>>>>>
Q. 309: When do you stop testing?
A. When the specified number of faults are found.
B. When the test completion criteria are met.
C. When all high and medium priority tests are complete.
D. When all statements have been executed - Correct Answers -A
When do you stop testing?
A. When the specified number of faults are found.
B. When the test completion criteria are met.
C. When all high and medium priority tests are complete.
D. When all statements have been executed - Correct Answers -B
, What is the smallest number of test cases required to Provide 100% branch coverage?
If(x>y) x=x+1;
else y=y+1;
while(x>y)
{
y=x*y; x=x+1;
}
A. 1
B. 2
C. 3
D. 4 - Correct Answers -B
Match the following.
1. Configuration identification
2. Configuration control
3. Status reporting
4. Configuration auditing
a. Maintains of CI�s in a library
b. Checks on the contents of the library
c. Function recording and tracking problems.
d. Requires the all CI�s and their versions in the system are known
A.
1-d, 2-c, 3-d, 4-a.
B. 1-d, 2-a, 3-c, 4-b.
C. 1-a, 2-b, 3-d, 4-c.
D. 1-c, 2-b, 3-a, 4-d. - Correct Answers -B
Integration testing in the large involves:
A. Testing the system when combined with other systems.
B. Testing a sub-system using stubs and drivers.
C. Testing a system with a large number of users.
D. Combing software components and testing them in one go. - Correct Answers -A
How are error guessing and exploratory testing similar?
A. Both are widely used formal techniques
B. Both are white-box test design techniques
C. Both are experience-based testing
D. Both are effective at all testing levels - Correct Answers -C
ISTQB PART1.4 (100NOS)
Cost of the reviews will not include.
A. Review process itself
B. Metrics analysis
C. Tool support.
D. Process improvement. - Correct Answers -C
Regression testing always
involves
A. Testing whether a known software fault been fixed.
B. Executing a large number of different tests.
C. Testing whether modifications have introduced adverse side effects.
D. Using a test automation tool. - Correct Answers -C
Capture and replay facilities are least likely to be used to _______
A. Performance testing
B. Recovery testing
C. GUI testing
D. User requirements. - Correct Answers -D
Which tool will be used to test the flag memory leaks and unassigned pointers
A. Dynamic analysis tool
B. Static Analysis tool.
C. Maintenance tool.
D. Configuration tool. - Correct Answers -A
Cyclomatic complexity is used to calculate
A. Number of independent paths in the basis set of a program
B. Number of binary decisions + 1
C. Number bound for the number of tests that must be conducted to ensure that all
statements have been executed at least once
D. Number of branches and decisions - Correct Answers -B
,Which of the following is not included in Test Plan.
A. Features to be tested.
B. Environmental needs.
C. Suspension criteria.
D. Expected results. - Correct Answers -D
Software quality is not relevant to _______
A. Correctness
B. Usability
C. Viability
D. Reusability. - Correct Answers -C
Match the following:
1. Test estimation
2. Test control
3. Test monitoring
a. Measures of tracking process
b. Effort required to perform activities
c. Reallocation of resources
A. 1-b, 2-c, 3-a
B. 1-b, 2-a, 3-c
C. 1-c, 2-a, 3-b
D. 1-a, 2-b, 3-c
<<<<<< =================== >>>>>>
Q. 309: When do you stop testing?
A. When the specified number of faults are found.
B. When the test completion criteria are met.
C. When all high and medium priority tests are complete.
D. When all statements have been executed - Correct Answers -A
When do you stop testing?
A. When the specified number of faults are found.
B. When the test completion criteria are met.
C. When all high and medium priority tests are complete.
D. When all statements have been executed - Correct Answers -B
, What is the smallest number of test cases required to Provide 100% branch coverage?
If(x>y) x=x+1;
else y=y+1;
while(x>y)
{
y=x*y; x=x+1;
}
A. 1
B. 2
C. 3
D. 4 - Correct Answers -B
Match the following.
1. Configuration identification
2. Configuration control
3. Status reporting
4. Configuration auditing
a. Maintains of CI�s in a library
b. Checks on the contents of the library
c. Function recording and tracking problems.
d. Requires the all CI�s and their versions in the system are known
A.
1-d, 2-c, 3-d, 4-a.
B. 1-d, 2-a, 3-c, 4-b.
C. 1-a, 2-b, 3-d, 4-c.
D. 1-c, 2-b, 3-a, 4-d. - Correct Answers -B
Integration testing in the large involves:
A. Testing the system when combined with other systems.
B. Testing a sub-system using stubs and drivers.
C. Testing a system with a large number of users.
D. Combing software components and testing them in one go. - Correct Answers -A
How are error guessing and exploratory testing similar?
A. Both are widely used formal techniques
B. Both are white-box test design techniques
C. Both are experience-based testing
D. Both are effective at all testing levels - Correct Answers -C