• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 20 pages
Exam (elaborations)

CM Final Questions With Complete Solutions

Document preview thumbnail
Preview 3 out of 20 pages

CM Final Questions With Complete Solutions

Content preview

CM Final Questions With Complete Solutions

"Standardize" is one of the 5 S's. Correct Answers T

A BIM design begins with intelligent objects such as walls, roof,
and windows Correct Answers True

A BIM model cannot perform clash detection before the project
goes to the field Correct Answers False

A BIM model is a 3D representation of the physical and
functional characteristics of a building Correct Answers True

A change of process should trigger a training Correct Answers
true

A change order adjustment amount does not include general
overhead and profit. Correct Answers F

A claim can only be made after the project is complete. Correct
Answers F

A comprehensive quality control plan is the best way to control
quality during construction Correct Answers True

A good win-win example is using recycled concrete as a base
material for new roadways or driveways. Correct Answers True

A job hazard analysis focuses on jobs and tasks Correct Answers
True

,A LEAN program generates value. Correct Answers T

A LEAN program, once initiated, is good for many years
without improvement. Correct Answers F

A preparatory inspection is unnecessary to avoid miscues and
rework Correct Answers False

A project may go forward without paperwork Correct Answers
false

A public project has less governmental involvement than a
private project Correct Answers

A tailgate meeting to review safety procedures is a risk
management Correct Answers True

A zero-punch list should not be a goal of the project. Correct
Answers F

Adding contingencies may be a pre-bid method to offset a risk.
Correct Answers True

Additional time should always be asked for when processing a
change order Correct Answers True

After quality, safety is the number-one priority when managing
construction operations. Correct Answers False

AHJ does not include permits and inspections. Correct Answers
F

, AHJ stands for local Authorities Having Jurisdiction. Correct
Answers T

All BIM does is add a 3D component to 2D plans and specs.
Correct Answers False

An inspection is a check used when tracking quality. Correct
Answers True

An objective of sustainability is to reduce consumption of
nonrenewable resources, to minimize waste, and to create better
environments. Correct Answers true

An OSHA visit may be caused by an employee complaint.
Correct Answers true

An overcrowded worksite does not affect productivity Correct
Answers False

Application for payments is made on an AIA G702 form.
Correct Answers T

Arbitration can be more expensive than litigation. Correct
Answers true

Archeological findings are not a risk of the contractor Correct
Answers False

As-built drawings are part of contract close-out. Correct
Answers T

Document information

Uploaded on
March 1, 2026
Number of pages
20
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Classroom
4.0
(1212)
Sold
5007
Followers
3246
Items
56710
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions