• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

Certified Construction Manager Study Set Questions With Complete Solutions

Document preview thumbnail
Preview 2 out of 12 pages

Certified Construction Manager Study Set Questions With Complete Solutions

Content preview

Certified Construction Manager Study Set Questions With
Complete Solutions

A reimbursable contract is most appropriate when the work is
risky, it is impossible to define, and the amount of work is
unknown. True or False Correct Answers True

AIA Agency Contract (B141, B801) Correct Answers 1 or more
construction contracts; Designer is the owner's principal agent;
Designer handles the contract administration; Designer handles
the design

AIA CM at Risk Contract Correct Answers CM's limited
professional services during design; CM may self-perform work
at their own discretion without submitting bids; no option for
owner to reject GMP and continue CM's services; no option for
owner to require additional services after GMP is signed

An advantage of the Design-Build method is that the owner is
not liable for the design. True or False Correct Answers False

An important component of the pre-design phase is the
construction management plan. True or False Correct Answers
True

CM at Risk Advantags Correct Answers Well-suited for fast-
tracking, contractor (and subcontractor) input on design
alternatives, better cost info, permits "picking" of the builder

CM at Risk Disadvantages Correct Answers Change of CM's
accountability after, GMP (guaranteed maximum price) is

, signed, tempted to sign GMP "too soon", variations in
procurement methods

CM at Risk is when the CM takes over as the general contractor.
True or False Correct Answers True

CMAA Agency CM at Risk Contract Correct Answers CM's
extensive professional services during design; self-perform work
only if low bid, owners approves, and a separate GMP contract
is signed; owner may reject GMP, CM may continue as agent;
owner may require additional services after GMP is signed; CM
is responsible for the cost of the project; CM must bid (and be
low bidder) on work to be self-performed; project team concept
is to be maintained

CMAA Agency Contract (A1-A4) Correct Answers 1 or more
construction contracts; CM is the owner's personal agent; CM
handles the contract administration; Designer handles the design

CMAA Agency General Conditions Correct Answers
Inspection, testing, and rejection of non-conforming work;
provide a vehicle for making changes to the contract price and
time; insurance requirements for the contractor and the owner;
avenues for contract termination: for convenience, for default;
defining a mechanism for dispute resolution; responsibilities of
the owner, CM, designer, and contractor; site safety; monitoring
time and progress of the work; responsibilities and duties to
subcontractors and suppliers; owner's right to perform work and
issue separate contracts; procedures for progress payments,
withholding payments, and issuing final payment

Document information

Uploaded on
March 1, 2026
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Classroom
4.0
(1207)
Sold
4971
Followers
3241
Items
56268
Last sold
3 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions