Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

BA 320 EXAM 2 || A+ GRADED.

Document preview thumbnail
Preview 2 out of 6 pages

BA 320 EXAM 2 || A+ GRADED.

Content preview

BA 320 EXAM 2 || A+ GRADED.
What are the different types of networks? correct answers Project Network with arrows and
nodes, PDM (Precedence Diagramming Method)

Slack / Float (SL) correct answers how long can an activity be delayed

SL correct answers LS - ES or LF - EF

Critical Path: correct answers The longest path through the activity network that allows for
the completion of all project-related activities.

Represents the shortest expected time in which the entire project can be completed.

Non-Critical Path correct answers Series of activities that can be slipped to a certain degree
without threatening the completion date of the overall project

Sensitivity correct answers How likely a CP is likely to change (Gnatt chart can be used for this)

When do you move to Critical to Non-Critical? correct answers When you need to use slack?

Free slack (FS) correct answers is the amount of time an activity can be delayed without delaying
any immediately following (successor) activity

Total slack tells us correct answers the amount of time an activity can be delayed and not delay
the project

Total slack is correct answers the amount of time an activity can exceed its early finish date
without affecting the project end date or an imposed completion date

What are the different ways to report a status? correct answers Gnatt chart, milestone chart,
control chart

Why is time burn rate insufficient to do analysis? correct answers Because you also need to look
at the budget burn rate to determine how much is being spent.

What is Earned Value Management (EVM)? correct answers is a project management technique
for measuring project performance and progress in an objective manner ---- it is the percent
complete of baseline budget earned by actual work performed.

Earned Value correct answers Authorized budget for work actually

EV = correct answers PV to date x RP

Cost Variance (CV) = correct answers EV - AC (Earned Value - Actual Cost)

, Schedule Variance (SV) = correct answers EV - PV

CPI Cost Performance Index correct answers EV/AC

SPI Schedule Performance Index correct answers EV/PV

Burn Rate = correct answers 1/CPI

Simple Budget Estimate at Completion = correct answers Original Budget Estimate/ CPI

Planned Value (PV) = correct answers Planned % complete * Budget at Completion

Earned Value (EV) = correct answers % Complete * Budget at Completion

Resource smoothing: correct answers CNHF

Consists of moving non-critical to non-critical PRIOR to baselining
Never impacts the end date
Has a minimal impact on financials
Focuses on scarce resources

Finish-to-Finish correct answers Predecessor must finish before Successor can finish.
-Laying Asphalt must be complete before line painting can be completed

Finish-to-Start correct answers Predecessor must finish before Successor can start.
-Land must be purchased before road building can start

What are the 8 options to react to a change request? correct answers AUCASOCJ




Add Lead Time to overlap activities

Use available Lag Time

Change (Reduce) Durations

Adjust Resources

Schedule overtime

Outsource project work if previously authorized

Change the Scope

Document information

Uploaded on
February 28, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.19

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton
3.7
(118)
Sold
791
Followers
438
Items
40035
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions