2021 PMP EXAM QUESTIONS WITH COMPLETE SOLUTIONS
GUARANTEED PASS BRAND NEW 2026
A set of conditions that is required to be met before
deliverables are accepted. - CORRECT ANSWER -Acceptance
Criteria
Products, results, or capabilities produced by a project and
validated by the project customer or sponsors as meeting their
specified acceptance criteria. - CORRECT ANSWER -Accepted
Deliverables
Within the quality management system, blank is an assessment
of correctness. - CORRECT ANSWER -Accuracy
The process of confirming human resource availability and
obtaining the team necessary to complete project activities. -
CORRECT ANSWER -Acquire Project Team
Obtaining human and material resources necessary to perform
project activities. Blank implies a cost of resources, and is not
necessarily financial. - CORRECT ANSWER -Acquisition
1|Page
,A distinct, scheduled portion of work performed during a
course of a project. - CORRECT ANSWER -Activity
Multiple blank associated with each schedule activity that can
be included within the activity list. Blank include activity codes,
predecessor activities, successor activities, logical relationships,
leads and lags, resource requirements, imposed dates,
constraints, and assumptions. - CORRECT ANSWER -Activity
Attributes
One or more numerical or text values that identify
characteristics of the work or in some way categorize the
schedule activity that allows filtering and ordering of activities
within reports. - CORRECT ANSWER -Activity Code
The projected cost of the scheduled activity that include the
cost of all resources required to perform and complete the
activity, including - CORRECT ANSWER -Activity Cost Estimates
Activity Duration - CORRECT ANSWER -all cost types and cost
components.
2|Page
,Activity Duration Estimates - CORRECT ANSWER -The time in
calendar units between the start and finish of a schedule
activity.
Activity Identifier - CORRECT ANSWER -The quantitative
assessments of the likely number of time periods that are
required to complete an activity.
Activity List - CORRECT ANSWER -A short, unique numeric or
text identification assigned to each schedule activity to
differentiate that project activity from other activities. Typically
unique within any one project schedule network diagram.
Activity Resource Requirements - CORRECT ANSWER -A
documented tabulation of schedule activities that shows the
activity description, activity identifier, and a sufficiently detailed
scope of work description so project team members understand
what work is to be performed.
Actual Cost (AC) - CORRECT ANSWER -The types and quantities
of resources required for each activity in a work package.
3|Page
, Actual Duration - CORRECT ANSWER -The realized cost incurred
for the work performed on an activity during a specific time
period.
Adaptive Life Cycle - CORRECT ANSWER -The time in calendar
units between the actual start date of the schedule activity and
either the data date of the project schedule if the schedule
activity is in progress or the actual finish date if the schedule
activity is complete.
Additional Quality Planning Tools - CORRECT ANSWER -A
project life cycle, also known as change-driven or agile
methods, that is intended to facilitate change and require a high
degree of ongoing stakeholder involvement. Blank are also
iterative and incremental, but differ in that iterations are very
rapid (usually 2-4 weeks in length) and are fixed in time and
resources.
Adjusting Leads and Lags - CORRECT ANSWER -A set of tools
used to define the quality requirements and to plan effective
quality management activities. They include, but are not limited
4|Page
GUARANTEED PASS BRAND NEW 2026
A set of conditions that is required to be met before
deliverables are accepted. - CORRECT ANSWER -Acceptance
Criteria
Products, results, or capabilities produced by a project and
validated by the project customer or sponsors as meeting their
specified acceptance criteria. - CORRECT ANSWER -Accepted
Deliverables
Within the quality management system, blank is an assessment
of correctness. - CORRECT ANSWER -Accuracy
The process of confirming human resource availability and
obtaining the team necessary to complete project activities. -
CORRECT ANSWER -Acquire Project Team
Obtaining human and material resources necessary to perform
project activities. Blank implies a cost of resources, and is not
necessarily financial. - CORRECT ANSWER -Acquisition
1|Page
,A distinct, scheduled portion of work performed during a
course of a project. - CORRECT ANSWER -Activity
Multiple blank associated with each schedule activity that can
be included within the activity list. Blank include activity codes,
predecessor activities, successor activities, logical relationships,
leads and lags, resource requirements, imposed dates,
constraints, and assumptions. - CORRECT ANSWER -Activity
Attributes
One or more numerical or text values that identify
characteristics of the work or in some way categorize the
schedule activity that allows filtering and ordering of activities
within reports. - CORRECT ANSWER -Activity Code
The projected cost of the scheduled activity that include the
cost of all resources required to perform and complete the
activity, including - CORRECT ANSWER -Activity Cost Estimates
Activity Duration - CORRECT ANSWER -all cost types and cost
components.
2|Page
,Activity Duration Estimates - CORRECT ANSWER -The time in
calendar units between the start and finish of a schedule
activity.
Activity Identifier - CORRECT ANSWER -The quantitative
assessments of the likely number of time periods that are
required to complete an activity.
Activity List - CORRECT ANSWER -A short, unique numeric or
text identification assigned to each schedule activity to
differentiate that project activity from other activities. Typically
unique within any one project schedule network diagram.
Activity Resource Requirements - CORRECT ANSWER -A
documented tabulation of schedule activities that shows the
activity description, activity identifier, and a sufficiently detailed
scope of work description so project team members understand
what work is to be performed.
Actual Cost (AC) - CORRECT ANSWER -The types and quantities
of resources required for each activity in a work package.
3|Page
, Actual Duration - CORRECT ANSWER -The realized cost incurred
for the work performed on an activity during a specific time
period.
Adaptive Life Cycle - CORRECT ANSWER -The time in calendar
units between the actual start date of the schedule activity and
either the data date of the project schedule if the schedule
activity is in progress or the actual finish date if the schedule
activity is complete.
Additional Quality Planning Tools - CORRECT ANSWER -A
project life cycle, also known as change-driven or agile
methods, that is intended to facilitate change and require a high
degree of ongoing stakeholder involvement. Blank are also
iterative and incremental, but differ in that iterations are very
rapid (usually 2-4 weeks in length) and are fixed in time and
resources.
Adjusting Leads and Lags - CORRECT ANSWER -A set of tools
used to define the quality requirements and to plan effective
quality management activities. They include, but are not limited
4|Page