• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

Nevada A-7 Excavating And Grading Practice Actual Exam Paper 2026

Document preview thumbnail
Preview 2 out of 7 pages

NEVADA A-7 EXCAVATING AND GRADING PRACTICE ACTUAL EXAM PAPER 2026

Content preview

NEVADA A-7 EXCAVATING AND GRADING
PRACTICE ACTUAL EXAM PAPER 2026

◉ Track Loader. Answer: an engineering vehicle consisting of a
tracked chassis with a loader for digging and loading material


◉ Bobcat. Answer: is a small, rigid-frame, engine-powered machine
with lift arms used to rough and fine grade a lot


◉ Bulldozer. Answer: a powerful tractor with a broad upright blade
at the front for clearing ground


◉ If the excavation is not to phase specifications, who absorbs the
cost to correct?. Answer: The excavating contractor


◉ What should you do with topsoil that is on the lot. Answer: Save
enough for the backfill and then put the rest in a stockpile for future
use


◉ Name three things that should be considered when excavating a
foundation that has excess dirt?. Answer: a. Haling Costs
b. Amount of backfill
C.future Digs

, ◉ What is a foundation overdig?. Answer: The area excavated
beyond the dimensions given for the actual footer. It enables the
footer and poured wall contractors freedom to work safely


◉ What is the minimum over dig in your area for full foindation,
kneewall foundation, crawl space and slab foundations?. Answer: 1.
We don't use full foundations but i would say 3'
2. Knee walls we don't use either but the answer is 2'
3. Crawl space is 2'
4. Slab foundations don't need any over dig


◉ Since equipment should not travel on pavement or curbs without
protection, what types of things can be used for protection?. Answer:
Rubber mats, built up soil bases, wood planks


◉ Name two ways to protect an excavation from freezing. Answer: 1.
Straw and poly
2. Leave excavation 8-12" until excavation


◉ What should be accomplished by the rough grading of a lot?.
Answer: Swales and driveway grades are to be established and the
rough grade should be 4-6" from final grade.

Document information

Uploaded on
February 25, 2026
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.3
(18)
Sold
209
Followers
6
Items
63981
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions