The Virginia Stormwater Virginia Stormwater Management Act, Virginia
Management Program is authorized Stormwater Management Program Regulation
by the ______ and administered
through the ______
VPDES Permit/Construction GP greater than or equal to an acre
authorizes discharge of stormwater
from construction activities that are
The Stormwater Management Act permit, regulate, and control stormwater runoff
requires the State Water Control
Board to
DEQ has ___ days to complete review 90
of real or potential inter-jurisdictional
impacts upon request
The Stormwater Management Act staff of a stormwater program, anyone contracted
requires the following individuals to by a VSMP authority, standard and specification
obtain and maintain a certificate of holders
competency
https://quizlet.com/1145754305/swm-deq-exam-updated-2026-questions-answers-latest-already-graded-a-update-2026-flash-cards/?new 1/13
, 2/19/26, 8:12 AM SWM DEQ Exam (updated 2026) Questions & Answers | Latest Already Graded A+ UPDATE |2026 Flashcards | Quizlet
The dual certificate will expire three the latest date of the certificates
years from
SWM plan must be approved by ___ VSMP program authority
before land disturbance
The water quality criteria sets a site- 0.41 lbs/acre/year
based load limit of ____ of total
phosphorus for new development
The phosphorus load limit uses the 10% impervious cover
Part II B and II C water quantity channel protection and flood protection
criteria addresses
Which two plans in the SWPPP must SWM plan, ESC plan
be approved?
Does the SWM plan address runoff post-construction
during or after construction?
What is the lower limit of the range 10%
of imperviousness that can result in
stream degradation?
What do land disturbing activities excavating, clearing, grading
consist of?
LDA threshold for the SWM Act and 1 acre or 2500 square feet for Chesapeake Bay
Regulation Preservation Act
https://quizlet.com/1145754305/swm-deq-exam-updated-2026-questions-answers-latest-already-graded-a-update-2026-flash-cards/?new 2/13
SWM DEQ Exam (updated 2026) Questions &
Answers | Latest Already Graded A+ UPDATE
|2026
Save
Terms in this set (114)
The Virginia Stormwater Virginia Stormwater Management Act, Virginia
Management Program is authorized Stormwater Management Program Regulation
by the ______ and administered
through the ______
VPDES Permit/Construction GP greater than or equal to an acre
authorizes discharge of stormwater
from construction activities that are
The Stormwater Management Act permit, regulate, and control stormwater runoff
requires the State Water Control
Board to
DEQ has ___ days to complete review 90
of real or potential inter-jurisdictional
impacts upon request
The Stormwater Management Act staff of a stormwater program, anyone contracted
requires the following individuals to by a VSMP authority, standard and specification
obtain and maintain a certificate of holders
competency
https://quizlet.com/1145754305/swm-deq-exam-updated-2026-questions-answers-latest-already-graded-a-update-2026-flash-cards/?new 1/13
, 2/19/26, 8:12 AM SWM DEQ Exam (updated 2026) Questions & Answers | Latest Already Graded A+ UPDATE |2026 Flashcards | Quizlet
The dual certificate will expire three the latest date of the certificates
years from
SWM plan must be approved by ___ VSMP program authority
before land disturbance
The water quality criteria sets a site- 0.41 lbs/acre/year
based load limit of ____ of total
phosphorus for new development
The phosphorus load limit uses the 10% impervious cover
Part II B and II C water quantity channel protection and flood protection
criteria addresses
Which two plans in the SWPPP must SWM plan, ESC plan
be approved?
Does the SWM plan address runoff post-construction
during or after construction?
What is the lower limit of the range 10%
of imperviousness that can result in
stream degradation?
What do land disturbing activities excavating, clearing, grading
consist of?
LDA threshold for the SWM Act and 1 acre or 2500 square feet for Chesapeake Bay
Regulation Preservation Act