The voltage limits and mechanical strength of a live line tool is best
specified by: - ANSWER- The manufacturers requirements.
Live line tools can be modified to meet the needs of the work. What is
NOT an acceptable strategy for tool modification: - ANSWER- A utility
worker has evaluated the tool modification and approved the change.
Live line tools can be modified to meet the needs of the work.
Acceptable strategies for tool modification include: - ANSWER- 1.
Changes to the tool do not violate other applicable standards.
2. The tool has been inspected and tested by a professional engineer.
3. The tool modification was approved by an engineer using applicable
standards.
Insulating hot rope (live line rope) is tested in accordance to ASTM
F1701. The purpose of this test is to: - ANSWER- Determine the current
leakage under dry and wet rope conditions.
,2|Page
Live line rigid cover in compliance with CAN/ULC-61229 includes the
following pieces or protective insulating equipment EXCEPT for: -
ANSWER- Insulating line hose.
Live line rigid cover in compliance with CAN/ULC-61229 includes the
following pieces or protective insulating equipment, including: -
ANSWER- 1. Conductor cover (air guard).
2. Pole guard.
3. Switch and insulator shields.
This statement is true, regarding the application of cover-up on
energized high voltage lines: - ANSWER- If left overnight, a visual
inspection must be performed at minimum prior to use.
What is NOT a fundamental principle of live line work tools: -
ANSWER- Valid lab test dates provide sufficient verification of tool
dielectric properties.
Live line work tool fundamentals include: - ANSWER- 1. Insulating
quality of protective tools shall be validated through checks, inspections
and tests.
2. The voltage class of tools shall correspond to the voltage being
worked on.
3. Prior to severing the conductor, current is verified as flowing through
the rated jumper.
, 3|Page
The dielectric properties of live line tools and equipment are affected by
the following factors: - ANSWER- Air density, humidity and corona.
CSAZ1006 requires the Entry Supervisor to execute certain duties in the
field prior to entering a confined space, NOT INCLUDING: -
ANSWER- Conducting a comprehensive risk assessment to understand
the associated risks of the space.
CSAZ1006 requires the Entry Supervisor to execute certain duties in the
field prior to entering a confined space, including: - ANSWER- 1.
Ensuring those entering the space are trained and competent.
2. Verifying that rescue procedures are in place and communication is
established.
3. Ensure that acceptable conditions are maintained for the duration of
the entry.
Energized electrical cables inside underground chambers can be
disturbed and produce a hazardous environment. What precautions
should be taken? - ANSWER- 1. Ensure that cables are held in place
prior to undoing or cutting fasteners.
2. Don't climb onto cables, junctions, connections, splices or supports.
3. Verify equipment condition if required to move cables, junctions or
splices.
The roll of the attendant of a confined space electrical vault shall NOT
do the following: - ANSWER- Enter the space to provide assistance
when required.
CUSP - T&D ACTUAL EXAM PREP 2026
150 QUESTIONS AND CORRECT
DETAILED ANSWERS WITH XPERT
FEEDBACK | ALREADY A GRADED |
NEW AND REVISED
The voltage limits and mechanical strength of a live line tool is best
specified by: - ANSWER- The manufacturers requirements.
Live line tools can be modified to meet the needs of the work. What is
NOT an acceptable strategy for tool modification: - ANSWER- A utility
worker has evaluated the tool modification and approved the change.
Live line tools can be modified to meet the needs of the work.
Acceptable strategies for tool modification include: - ANSWER- 1.
Changes to the tool do not violate other applicable standards.
2. The tool has been inspected and tested by a professional engineer.
3. The tool modification was approved by an engineer using applicable
standards.
Insulating hot rope (live line rope) is tested in accordance to ASTM
F1701. The purpose of this test is to: - ANSWER- Determine the current
leakage under dry and wet rope conditions.
,2|Page
Live line rigid cover in compliance with CAN/ULC-61229 includes the
following pieces or protective insulating equipment EXCEPT for: -
ANSWER- Insulating line hose.
Live line rigid cover in compliance with CAN/ULC-61229 includes the
following pieces or protective insulating equipment, including: -
ANSWER- 1. Conductor cover (air guard).
2. Pole guard.
3. Switch and insulator shields.
This statement is true, regarding the application of cover-up on
energized high voltage lines: - ANSWER- If left overnight, a visual
inspection must be performed at minimum prior to use.
What is NOT a fundamental principle of live line work tools: -
ANSWER- Valid lab test dates provide sufficient verification of tool
dielectric properties.
Live line work tool fundamentals include: - ANSWER- 1. Insulating
quality of protective tools shall be validated through checks, inspections
and tests.
2. The voltage class of tools shall correspond to the voltage being
worked on.
3. Prior to severing the conductor, current is verified as flowing through
the rated jumper.
, 3|Page
The dielectric properties of live line tools and equipment are affected by
the following factors: - ANSWER- Air density, humidity and corona.
CSAZ1006 requires the Entry Supervisor to execute certain duties in the
field prior to entering a confined space, NOT INCLUDING: -
ANSWER- Conducting a comprehensive risk assessment to understand
the associated risks of the space.
CSAZ1006 requires the Entry Supervisor to execute certain duties in the
field prior to entering a confined space, including: - ANSWER- 1.
Ensuring those entering the space are trained and competent.
2. Verifying that rescue procedures are in place and communication is
established.
3. Ensure that acceptable conditions are maintained for the duration of
the entry.
Energized electrical cables inside underground chambers can be
disturbed and produce a hazardous environment. What precautions
should be taken? - ANSWER- 1. Ensure that cables are held in place
prior to undoing or cutting fasteners.
2. Don't climb onto cables, junctions, connections, splices or supports.
3. Verify equipment condition if required to move cables, junctions or
splices.
The roll of the attendant of a confined space electrical vault shall NOT
do the following: - ANSWER- Enter the space to provide assistance
when required.