CONSTRUCTION MANAGEMENT COMPREHENSIVE EXAM
2026 QUESTIONS AND SOLUTIONS SCORED A+
✔✔1. Is it still possible, under contracts involving separate inspections by other
agencies having jurisdiction, to maintain the one-to-one relationship with the contractor?
- ✔✔yes ********
✔✔2. What happens when the terms of the Supplementary General Conditions are in
conflict with the General Conditions? - ✔✔******
✔✔3. Can the Supplementary General Conditions be used to modify the Agreement
form? - ✔✔*****
✔✔4. Which of the following listed documents is the preferred location for specifying the
amount of liquidated
damages? Which document normally is used to specify the terms and conditions of the
liquidated damages? - ✔✔Notice Inviting Bids
Instructions to Bidders
Bid or Proposal
Agreement
General Conditions of the Contract
Supplementary General Conditions
Division 01 General Requirements
✔✔5. True or false? Changes on shop drawings are meant to supersede the original
contract drawings. - ✔✔False
✔✔6. Should an existing soils report be included as part of the contract documents? -
✔✔Chegg says yes but idk???
✔✔7. Name the international (FIDIC) equivalent to the following terms commonly used
in U.S. construction contracts: - ✔✔Differing Site Conditions
Bid or Proposal
Changes in the Work
Date of Notice to Proceed
Addenda
Guarantee Period
Bid Schedule (unit-price projects)
Schedule
Supplementary General Conditions
✔✔8. May changes to the documents be done by Addenda after opening bids, but prior
to Award? - ✔✔NO, addenda only before bid submission
2026 QUESTIONS AND SOLUTIONS SCORED A+
✔✔1. Is it still possible, under contracts involving separate inspections by other
agencies having jurisdiction, to maintain the one-to-one relationship with the contractor?
- ✔✔yes ********
✔✔2. What happens when the terms of the Supplementary General Conditions are in
conflict with the General Conditions? - ✔✔******
✔✔3. Can the Supplementary General Conditions be used to modify the Agreement
form? - ✔✔*****
✔✔4. Which of the following listed documents is the preferred location for specifying the
amount of liquidated
damages? Which document normally is used to specify the terms and conditions of the
liquidated damages? - ✔✔Notice Inviting Bids
Instructions to Bidders
Bid or Proposal
Agreement
General Conditions of the Contract
Supplementary General Conditions
Division 01 General Requirements
✔✔5. True or false? Changes on shop drawings are meant to supersede the original
contract drawings. - ✔✔False
✔✔6. Should an existing soils report be included as part of the contract documents? -
✔✔Chegg says yes but idk???
✔✔7. Name the international (FIDIC) equivalent to the following terms commonly used
in U.S. construction contracts: - ✔✔Differing Site Conditions
Bid or Proposal
Changes in the Work
Date of Notice to Proceed
Addenda
Guarantee Period
Bid Schedule (unit-price projects)
Schedule
Supplementary General Conditions
✔✔8. May changes to the documents be done by Addenda after opening bids, but prior
to Award? - ✔✔NO, addenda only before bid submission