Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

SCHM 2301 LATEST 2026 ALL FINALS TIP QUESTIONS AND ANSWERS MARKED

Document preview thumbnail
Preview 2 out of 8 pages

SCHM 2301 LATEST 2026 ALL FINALS TIP QUESTIONS AND ANSWERS MARKED

Content preview

SCHM 2301 LATEST 2026 ALL FINALS TIP QUESTIONS
AND ANSWERS MARKED A+
✔✔pros and cons of capacity lead strategy - ✔✔pros: ensure that sales will not be lost,
helps companies gain market share during the early stages of a product's life cycle
cons: under-utilization if sales do not grow as expected

✔✔add or remove based on average demand - ✔✔balances the risk of having too much
capacity and missing out on sales

✔✔capacity lag strategy - ✔✔wait to add capacity until after demand is actually known

✔✔pros and cons of capacity lag strategy - ✔✔pros: lowers risk of over-expansion
cons: lost sales

✔✔Types of capacity changes - ✔✔1. strategic
2. tactical
3. operational

✔✔strategic capacity changes - ✔✔takes a long time to implement, large increases or
decreases in capacity, limited by physical plant

✔✔tactical capacity changes - ✔✔medium term (6-24 months), medium-sized capacity
changes (can also be smaller), limited by specialized labor, equipment, space

✔✔operational capacity changes - ✔✔short term (0-6 months), usually require small
changes to low-skilled labor, equipment, and space, limited by low-skilled labor,
equipment, and space

✔✔economies of scale - ✔✔as production volumes increase with additions of capacity,
the unit cost to produce a product decreases until some optimal level is reached

✔✔Reasons for economies of scale - ✔✔1. Allocation of fixed costs
2. Equipment and construction costs
3. Lower costs for purchases
4. Learning curve

✔✔diseconomies of scale - ✔✔occurs when the cost per unit increases as an
operation's size increases

✔✔process capacity - ✔✔the limit on the amount of output that a process can produce
given an amount of inputs and resources made available to the process

, ✔✔operations capacity limiting resource - ✔✔tools, labor, machine capacity, supplier
capacity

✔✔transportation capacity limiting resource - ✔✔pallets, carts, fork-lift trucks, trucks,
trains, airplanes

✔✔inspection capacity limiting resource - ✔✔inspectors, inspection stations, gauges,
robots, machine-vision equipment

✔✔delay capacity limiting resource - ✔✔space on the shop floor, bins, carts, racks

✔✔storage capacity limiting resource - ✔✔floor space, racks, bins, stockrooms,
stockroom clerks

✔✔2 ways to express capacity limits - ✔✔1. maximum capacity
2. effective capacity

✔✔maximum capacity - ✔✔highest output rate that an activity or process can achieve
under ideal conditions in the short term, aka: rated/design capacity

✔✔effective capacity - ✔✔the process that can be sustained, usually only 70-80% of
maximum design capacity

✔✔utilization - ✔✔the percentage of process capacity that is actually used
actual output rate/(effective or maximum) capacity

✔✔Why effective capacity may be greater than actual production - ✔✔external:
insufficient demand or supplied inputs
internal: lack of resource availability, efficiency problems, quality problems
may have insufficient yield rate

✔✔yield rate - ✔✔percentage of good units produced as a percentage of total units
begun

✔✔Theory of constraints - ✔✔overall management system that strives to improve
system performance by identifying, focusing on, and managing constraints

✔✔5 basic principles of TOC - ✔✔1. every process has a constraint
2. every process contains variance that consumes capacity
3. every process must be managed as a system
4. performance measures are crucial to the process' success
5. every process must continually improve

✔✔constraint - ✔✔physical limitation applied by a person, equipment, or facilities

Document information

Uploaded on
February 8, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMCAFE
3.4
(19)
Sold
157
Followers
7
Items
26054
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions