A 4 inch Ø building drain installed 1/8 inch
horizontally must have a minimum of
____ fall per foot to meet the Code.
The 22 basic Principles of Master Section 5
Plumbing is enumerated in what
section of RA 1378?
Master Plumber Reviewer 2/5/2026
,Master Plumber Reviewer Page 2
Access and clearance shall be 305 mm
provided for the required testing,
maintenance and repair. What is the
minimum access and clearance space
between the lowest portion of the
assembly and the grade, floor or
platform?
According to NPCP, at least ____ of the 1
vertical stacks in the plumbing system
must be extended full size through
the roof
According to Subsection 1206.1 of the 200
NPCP, any such piping ____ mm
diameter and larger may have a slope
of not less than 0.5%
Master Plumber Reviewer 2/5/2026
,Master Plumber Reviewer Page 3
acronym for AVB as a backflow Atmospheric Vacuum Breaker
prevention device
an adjustable tubing connection, Slip Joint
consisting of a compression nut, a
friction ring, and a compression
washer, designed to fit a threaded
adapter fitting or a standard taper
pipe thread.
Master Plumber Reviewer 2/5/2026
, Master Plumber Reviewer Page 4
The Administrative Authority _____ for May issue a Partial Permit
the construction of a part of a large
and/or complicated plumbing system
before the entire plans and
specifications for the whole system
have been submitted or approved,
provided adequate information and
detailed statements have been filed,
complying with all pertinent
requirements of this Code.
The Administrative Authority may, in Issued in error, on the basis of incorrect information
writing, suspend or revoke a permit supplied, in violation of pertinent ordinances, rules
issued under the provisions of this and regulations
Code whenever
Master Plumber Reviewer 2/5/2026
Master Plumber Reviewer Save
Terms in this set (282)
A 4 inch Ø building drain installed 1/8 inch
horizontally must have a minimum of
____ fall per foot to meet the Code.
The 22 basic Principles of Master Section 5
Plumbing is enumerated in what
section of RA 1378?
Master Plumber Reviewer 2/5/2026
,Master Plumber Reviewer Page 2
Access and clearance shall be 305 mm
provided for the required testing,
maintenance and repair. What is the
minimum access and clearance space
between the lowest portion of the
assembly and the grade, floor or
platform?
According to NPCP, at least ____ of the 1
vertical stacks in the plumbing system
must be extended full size through
the roof
According to Subsection 1206.1 of the 200
NPCP, any such piping ____ mm
diameter and larger may have a slope
of not less than 0.5%
Master Plumber Reviewer 2/5/2026
,Master Plumber Reviewer Page 3
acronym for AVB as a backflow Atmospheric Vacuum Breaker
prevention device
an adjustable tubing connection, Slip Joint
consisting of a compression nut, a
friction ring, and a compression
washer, designed to fit a threaded
adapter fitting or a standard taper
pipe thread.
Master Plumber Reviewer 2/5/2026
, Master Plumber Reviewer Page 4
The Administrative Authority _____ for May issue a Partial Permit
the construction of a part of a large
and/or complicated plumbing system
before the entire plans and
specifications for the whole system
have been submitted or approved,
provided adequate information and
detailed statements have been filed,
complying with all pertinent
requirements of this Code.
The Administrative Authority may, in Issued in error, on the basis of incorrect information
writing, suspend or revoke a permit supplied, in violation of pertinent ordinances, rules
issued under the provisions of this and regulations
Code whenever