Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

CMGT 2400 FINAL EXAM STUDY GUIDE EXAM QUESTIONS AND ANSWERS

Document preview thumbnail
Preview 3 out of 17 pages

CMGT 2400 FINAL EXAM STUDY GUIDE EXAM QUESTIONS AND ANSWERS A group of Nurse practitioners is planning to purchase a 3-acre parcel of property located inside the city limits. They hope to develop a small office building that includes a clinic and other leasable space. They are currently working with an architect

Content preview

CMGT 2400 FINAL EXAM STUDY GUIDE EXAM
QUESTIONS AND ANSWERS
A group of Nurse practitioners is planning to purchase a 3-acre parcel of property located inside the city
limits. They hope to develop a small office building that includes a clinic and other leasable space. They
are currently working with an architect



In which of the project delivery phases is the team currently engaged - CORRECT ANSWER✅✅Predesign



Identify the tasks the nurse practitioners must accomplish during the predesign phase - CORRECT
ANSWER✅✅- assess the appropriateness of the site

- select a design team

- define building program

- identify governmental constraints



One of the most critical features of the design development phase of the building delivery process is -
CORRECT ANSWER✅✅making decisions about pragmatic solutions for various building systems



Which of the following is not one of the required items of a set of construction drawings - CORRECT
ANSWER✅✅Digital "walk-throughs"



A specification is a written document that provides information about _________ of a given material -
CORRECT ANSWER✅✅quality



The CSI MasterFormat is a standardized organizational system for specifications based on a numbering
system. An example of a specification number is 06 10 00. The number 06 in the example provided
above refers to a specifications group called - CORRECT ANSWER✅✅a Division



The divisions in the CSI MasterFormat that architects are most concerned with - CORRECT
ANSWER✅✅2-14

,the city of Metropolis is seeking bids for fast-track construction of a new City Hall Building and parking
garage. The most likely way a contractor will be selected is through - CORRECT ANSWER✅✅Multiple
price contracts



During the construction phase, the architect - CORRECT ANSWER✅✅observes construction on a regular
basis



The project manual is composed entirely of specifications - CORRECT ANSWER✅✅False



Which of the following aspects of design and construction is not regulated by the building code -
CORRECT ANSWER✅✅Aesthetic qualities



The primary objective of a building code is to ensure that all new construction and renovations provide a
____________ level of safety - CORRECT ANSWER✅✅minimum



Construction of a new building can only begin after - CORRECT ANSWER✅✅An application for a building
permit has been approved and received by the owner



The height of a guard rail and the clear space between members are
a_____________________regulation - CORRECT ANSWER✅✅fire safety



Dimension of the stair treads and risers - CORRECT ANSWER✅✅Life safety



Location of an exit access - CORRECT ANSWER✅✅fire safety



The size and properties of a steel column - CORRECT ANSWER✅✅structural safety



A prescriptive building code - CORRECT ANSWER✅✅provides a clear description of what is required to
satisfy code requirements



The IBC has been adopted for use - CORRECT ANSWER✅✅by many states in the US

, Which of the following factors are not used in the building code to determine the allowable height and
area of a building - CORRECT ANSWER✅✅land use



the occupancy i one of the most important considerations when determining the level of hazard present
in a building. Which of the following is not an occupancy-related hazard - CORRECT ANSWER✅✅the
number of kitchens provided in the building



A load on a surface element such as a floor or roof is given in - CORRECT ANSWER✅✅pounds per
square foot



In lab, laser levels/optical levels can be used to set interior/exterior elevations - CORRECT
ANSWER✅✅True



Let us now assume that the College wants to build the new building using type V A wood light frame
construction with no floor are increases related to frontage, what is the maximum allowable square
footage - CORRECT ANSWER✅✅18,000 sf



To which of the following categories do the construction standards not apply? - CORRECT
ANSWER✅✅types of buildings occupancies



A zoning ordinance consists of - CORRECT ANSWER✅✅a zoning map and text



Wood light frame construction originated in - CORRECT ANSWER✅✅chicago



Prior to the invention of wood light frame construction, connections in wood construction systems were
joined using - CORRECT ANSWER✅✅mortise and tenon or dovetail joints



The construction type illustrated in the diagram is an example of - CORRECT ANSWER✅✅platform
framing

Document information

Uploaded on
February 6, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANGRADES
3.4
(14)
Sold
95
Followers
2
Items
12022
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions