When /
does the Contingency Reserve Restoration Period begin?
/ // // // // // //
A. At the top of the hour after the Reportable Disturbance
// // // // // // // // // //
B. At the start of the Reportable Disturbance
// // // // // // //
C. At the end of the Disturbance Recovery Period
// // // // // // // //
D. /
When
/ /
all
/ /
Contingency
/ /
Reserve
/ /
has
/ /
been
/ /
exhausted -
/ // /
CORRECT
/ /
ANSWERS(S)✔✔C.
/ /
At the end of the Disturbance Recovery Period
/ // // // // // // //
,Which /
of
/ /
the
/ /
following
/ /
terms
/ /
is
/ /
defined
/ /
as
/ /
the
/ /
scan
/ /
rate
/ /
values
/ /
of
/ //
a /
Balancing
/ /
Authority's
/ /
ACE
/ /
measured
/ /
in
/ /
MW,
/ /
which
/ /
includes
/ /
the
/ /
difference
/ /
between the Balancing Authority's Net Interchange Actual
/ // // // // // //
and
// /
its
/ /
Net
/ /
Interchange
/ /
Scheduled,
/ /
,/ plus /
/ its /
/ Frequency Bias obligation, plus any known meter error? // // // // // // //
A. Automatic Time Error
// // //
B. Reporting ACE
// //
C. ACE Control Error
// // //
D. /
Reserve
/ /
Sharing
/ /
Group
/ /
Reporting - CORRECT ANSWERS(S)✔✔B. Reporting ACE
/ // // // // //
Which /
of
/ /
the
/ /
following
/ /
terms
/ /
applies
/ /
to
/ /
the
/ /
Western
/ /
Interconnection
/ /
only,
/ /
and
/ /
the
/ /
addition
/ /
, of
/ //
a /
component
/ /
to the ACE equation that modifies the control point for the
/ // // // // // // // // // //
purpose
// /
of
/ /
continuously
/ /
paying
/ /
back
/ /
Primary
/ /
Inadvertent
/ /
Interchange to correct accumulated time error?
/ // // // // //
A. Reporting ACE
// //
B. Automatic Time Error Correction
// // // //
C. Reserve Sharing Group Reporting ACE
// // // // //
D. /
Regulation
/ /
Reserve
/ /
Sharing
/ /
Group -
/ // /
CORRECT
/ /
ANSWERS(S)✔✔B. Automatic Time Error Correction
/ // // // //