• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 39 pages
Exam (elaborations)

Cts Practice Guide Updated 2026 Tested Solutions

Document preview thumbnail
Preview 4 out of 39 pages

CTS PRACTICE GUIDE UPDATED 2026 TESTED SOLUTIONS

Content preview

CTS PRACTICE GUIDE UPDATED 2026
TESTED SOLUTIONS

⫸ Who would belong to the Design team? Answer: Anyone with
Consultant in their title except the moving consultant


⫸ Which groups make up the Management Team? Answer: Developer,
Construction Manager, and Building Management Agency


⫸ The End-User, Facility Manager and Building Committee comprise
which team within the Project Team? Answer: Owner


⫸ Which group represent the generic roles that are important to the
Project process? Answer: Project Managers, Designers and Installers


⫸ Which project characteristics must be considered in order to
determine which method is best suited for a particular project? Answer:
Schedule, Size, Type, Complexity, and Procurement Requirements


⫸ What is an important aspect of funding that has a direct impact on the
project process and design/installation? Answer: Technical Support
Funding

,⫸ Whether a construction project is large or small, which milestones
must be achieved in a typical schedule? Answer: Programming, Building
Design, AV Bid, and Move-In


⫸ What type of project is a typical Consultant-Led Design-Bid-Build
contract structure good for? Answer: Long term projects with extended
project cycles


⫸ What is the risk in using an OFE/Integrator Installed contract
structure? Answer: System and infrastructure design and facility
functionality may suffer


⫸ What are some of the important project scope and size considerations
in selecting an AV provider? Answer: Financial Stability, Current
Workload, and Company Credentials


⫸ What type of document typically includes Project Size Requirements,
Corporate Profile, Team Personnel, and Warranty Response Time?
Answer: RFQ


⫸ a significant difference between the Two-Envelope Bid
Method and the Qualifications- Based Selection Method? Answer:
Negotiate with the highest ranking firm to finalize the contract


⫸ What is one of the disadvantages of contracting the AV integrator to
the electrical

,subcontractor? Answer: More layers of responsibility and
communication


⫸ When conducting a complete project bid process, what milestone
follows the issuing of the RFP? Answer: Pre-Bid Meeting


⫸ Under what circumstances would you likely use an A305-1986 form?
Answer: Scoring responses to an RFQ


⫸ What is the ideal way to contract an AV integrator? Answer: Directly
to the Owner


⫸ The process of identifying the activities that end-users need to
perform, and developing the functional descriptions of your systems is
referred to as:? Answer: Needs Analysis


⫸ What is the main task of the third Step of the Program Phase of a
Project? Answer: Conducting program meetings


⫸ What should be included in the written Program Report? Answer:
...A conceptual and functional system description


⫸ The more accurate means to estimate dimensions of a commercial
space during a site inspection would be to? Answer: Count Ceiling Tiles
in a drop tile instalation

, ⫸ A client requires a new boardroom. The sales person and engineer are
sent to the premises to measure the facility and talk to the client. At this
stage they should be performing a _ Answer: Needs Analysis


⫸ Sightlines for audience viewing in a given presentation space can be
improved by: Answer: Providing a sloped, or stepped, seating
arrangement


⫸ After presenting a proposal, what is the correct plan of action for
following up with the client? Answer: Regularly, until a decision is
made


⫸ AV professionals determine the end user's needs by examining three
things: the required applications, the tasks, and the: Answer: Functions
to support the applications


⫸ When working with a client to design an AV solution for a new
conference center, the client requests a detailed budget for the equipment
and installation. What phase is the project in? Answer: Design phase


⫸ The HDTV aspect ratio is equal to which of the following? Answer:
1.78:1


⫸ Please select the appropriate resolution for SXGA. Answer: 1280 x
1024

Document information

Uploaded on
January 31, 2026
Number of pages
39
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.1
(14)
Sold
195
Followers
1
Items
63507
Last sold
13 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions