Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 71 pages
Exam (elaborations)

NERC RC EXAM PREP|QUESTIONS AND 100% CORRECT WELL DETAILED ANSWERS|LATEST UPDATE!!!!!2026|GUARANTEED PASS|GRADED A+|VERIFIED

Document preview thumbnail
Preview 4 out of 71 pages

NERC RC EXAM PREP|QUESTIONS AND 100% CORRECT WELL DETAILED ANSWERS|LATEST UPDATE!!!!!2026|GUARANTEED PASS|GRADED A+|VERIFIED

Content preview

When does the Contingency Reserve Restoration Period begin?



A. At the top of the hour after the Reportable Disturbance

B. At the start of the Reportable Disturbance

C. At the end of the Disturbance Recovery Period

D. When all Contingency Reserve has been exhausted - ANSWER C. At the end of the
Disturbance Recovery Period



Which of the following terms is defined as the scan rate values of a Balancing Authority's
ACE measured in MW, which includes the difference between the Balancing Authority's Net
Interchange Actual and its Net Interchange Scheduled, plus its Frequency Bias obligation,
plus any known meter error?



A. Automatic Time Error

B. Reporting ACE

C. ACE Control Error

D. Reserve Sharing Group Reporting - ANSWER B. Reporting ACE



Which of the following terms applies to the Western Interconnection only, and the addition
of a component to the ACE equation that modifies the control point for the purpose of
continuously paying back Primary Inadvertent Interchange to correct accumulated time
error?



A. Reporting ACE


1

,B. Automatic Time Error Correction

C. Reserve Sharing Group Reporting ACE

D. Regulation Reserve Sharing Group - ANSWER B. Automatic Time Error Correction



You are a Balancing Authority Operator. A neighboring Balancing Authority in the
Interconnection suddenly has a 500 MW generator trip due to a generator ground. What
part of the ACE equation, ACE = (NIA-NIS) - 10B (FA-FS) - IME, allows you and other Balancing
Authorities in the Interconnection to help stabilize the Interconnection frequency error?



A. (FA- FS) - IME

B. NIA - NIS

C. 10B (FA-FS)

D. 4 IME - ANSWER C. 10B (FA-FS)



Balancing Authority A is scheduled to import a net 200 MW and is actually importing a net
150 MW. The Bias Setting is -100 MW/.1 HZ and Actual Frequency is 59.95 Hz. What is
Balancing Authority A's ACE reading?



A. +100 MW

B. -100 MW

C. 0 MW

D. -55 MW - ANSWER C. 0 MW



Which of the following elements is NOT included in the ACE equations frequency
component?



A. Actual Frequency (FA)

B. Scheduled Frequency (FS)

C. Frequency Bias Setting (B)



2

,D. Meter Error (IME) - ANSWER D. Meter Error (IME)



A Balancing Authority is slightly undergenerating its Actual System Frequency (FA) is 60.03
Hz. What is the result of the Balancing Authority's action?



A. The Balancing Authority is helping the Interconnection Frequency.

B. The Balancing Authority is in CPS1 violation.

C. The Balancing Authority is hurting the Interconnection Frequency.

D. The Balancing Authority is in BAAL violation - ANSWER A. The Balancing Authority is
helping the Interconnection Frequency



Which statement best describes the CPS1 requirement?



A. ACE must follow changes in load and schedule within a bandwidth called L10.

B. The Responsible Entity must operate so its CPS1 is greater than or equal to 100% for the
preceding 12-month period.

C. The average ACE for a defined 10-minute period must be within a limit called L10.

D. ACE must start to return to zero one minute after crossing zero. - ANSWER B. The
Responsible Entity must operate so its CPS1 is greater than or equal to 100% for the
preceding 12-month period



A Balancing Authority's CPS1 calculation is computed using its clock-minute average of two
values. What are those two values?



A. Reporting ACE and Frequency Error

B. Actual and Scheduled Net Interchange NIA and NIS.

C. L10 and Reporting ACE

D. Actual and Scheduled Frequency (FA and FS) - ANSWER A. Reporting ACE and
Frequency Error



3

, To conform to CPS requirements, a Balancing Authority must have which of the following?



A. CPS1 greater than or equal to 90% or BAAL greater than or equal to 100%.

B. CPS1 greater than or equal to 100% and ACE does not exceed BAAL more than 15
consecutive minutes.

C. CPS1 greater than or equal to 100% and ACE does not exceed BAAL more than 30
consecutive minutes.

D. CPS1 greater than or equal to 90% and ACE does not exceed BAAL more than 30
consecutive minutes. - ANSWER C. CPS1 greater than or equal to 100% and ACE does
not exceed BAAL more than 30 consecutive minutes.



What should a Balancing Authority set Scheduled Frequency to for a slow Time Error
Correction?



A. 60.02 Hz

B. 59.98 Hz

C. 59.80 Hz

D. 60.20 Hz - ANSWER A. 60.02 Hz



Which of the following is a potential source of Contingency Reserve?

1. Offline generation that takes 10 minutes to start and ramp to full output

2. Online generation at full load

3. Controllable load resources

4. Voltage reductions



A. 3 and 4

B. 2 and 3

C. 1 and 3

D. 1 and 2 - ANSWER C. 1 and 3


4

Document information

Uploaded on
January 27, 2026
Number of pages
71
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$18.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
THESTUDYVAULT
3.3
(16)
Sold
125
Followers
5
Items
12872
Last sold
4 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions