100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ACI CERTIFICATION – CONCRETE FIELD TESTING TECHNICIAN GRADE 1

Rating
-
Sold
-
Pages
23
Grade
A+
Uploaded on
27-01-2026
Written in
2025/2026

ACI CERTIFICATION – CONCRETE FIELD TESTING TECHNICIAN GRADE 1 ACI CERTIFICATION – CONCRETE FIELD TESTING TECHNICIAN GRADE 1 ACI CERTIFICATION – CONCRETE FIELD TESTING TECHNICIAN GRADE 1

Institution
ACI CERTIFICATION
Course
ACI CERTIFICATION










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI CERTIFICATION
Course
ACI CERTIFICATION

Document information

Uploaded on
January 27, 2026
Number of pages
23
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ACI CERTIFICATION – CONCRETE
FIELD TESTING TECHNICIAN
GRADE 1


Sampling Fresh Concrete: Collecting a representative sample of concrete
to be tested is as important as executing the test methods to obtain
_______________________________. - ANSWER- Accurate results
(Reference 1.2)


Sampling Fresh Concrete: This practice covers sampling from four types
of equipment , which are ________________________________,
________________________,
________________________________________, and
_____________________ ____________. - ANSWER- Stationary
mixers, paving mixers, revolving truck mixers, continuous mixers
(Reference 1.5)


Sampling Fresh Concrete: The elapsed time between obtaining the first
and final portions of the composite sample shall not exceed
____________________. - ANSWER- 15 minutes (Reference 1.5)


Sampling Fresh Concrete: Portions of a composite sample shall be
thoroughly remixed before beginning tests on the sample? True or
False? - ANSWER- True (Reference 1.5.5)

,Sampling Fresh Concrete: Start tests for slump, temperature, and air
content within ________________ after obtaining the final portion of
the composite sample. - ANSWER- 5 minutes (Reference 1.5.5 &
Figure 1.6)


Sampling Fresh Concrete: Start molding specimens for strength tests
within ___________________ after fabricating the composite sample. -
ANSWER- 15 minutes (Reference 1.5.5 & Figure 1.6)


Sampling Fresh Concrete: The concrete sample must be protected from
contamination and ______________________. - ANSWER-
Evaporation (Reference 1.2)


Sampling Fresh Concrete: The minimum sample for making strength test
specimens is _____________________. - ANSWER- 1 FT^3 (28 L)
(Reference 1.5.1)


Sampling Fresh Concrete: Where sampling from a stationary mixer, the
batch must be sampled at ______ or more regularly spaced intervals
during discharge of the middle portion of the batch. - ANSWER- Two
(Reference 1.5.2)


Sampling Fresh Concrete: When sampling from a paving mixer, obtain
samples from a least ________ difference portions of the pile and
combine them into one composite sample for test purposes. -
ANSWER- Five (Reference 1.5.3)

, Sampling Fresh Concrete: When sampling from revolving truck mixer,
sample the concrete by collecting ________ or more portions taken at
regularly spaced intervals during discharge of the middle portion of the
batch. - ANSWER- Two (Reference 1.5.2)


Sampling Fresh Concrete: Concrete samples from a truck mixer must be
obtained before any water or admixtures are added to the mixer at the
job site. True or False? - ANSWER- False (Reference 1.5.2)


Sampling Fresh Concrete: When the concrete contains aggregate larger
than that permitted for a particular test method, the sample of concrete
must be ______________________ before making the test. - ANSWER-
Wet screened (Reference 1.5.1)


Temperature of Fresh Concrete: The stem of the thermometer is
submerged a minimum of _______________________. - ANSWER- 3
inches (75 mm) (Reference 2.4)


Temperature of Fresh Concrete: The thermometer shall be capable of
accurately measuring the temperature of freshly mixed concrete to
_____________________ throughout a range of
_________________________. - ANSWER- 1 degree F (+/- 0.5 degree
C), 30 to 120 degree F (0 to 50 degree C) (Reference 2.3.2)


Temperature of Fresh Concrete: The thermometer shall be verified
within
__________________________________________________________

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Anahsmith Walden University
View profile
Follow You need to be logged in order to follow users or courses
Sold
18
Member since
2 year
Number of followers
9
Documents
1071
Last sold
1 month ago

3.8

4 reviews

5
2
4
1
3
0
2
0
1
1

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions