Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 20 pages
Exam (elaborations)

UST UPDATED 2026 EXAM SCRIPT QUESTIONS AND ANSWERS RATED

Document preview thumbnail
Preview 3 out of 20 pages

UST UPDATED 2026 EXAM SCRIPT QUESTIONS AND ANSWERS RATED

Content preview

UST UPDATED 2026 EXAM SCRIPT QUESTIONS AND
ANSWERS RATED A+
✔✔After completion of enhanced leak detection (ELD) test, the ELD test results must be
submitted to the _________________.
a.) The local agency
b.) The SWRCB
c.) Owner of the UST system
d.) To both the SWRCB and the local agency - ✔✔d.) To both the SWRCB and the local
agency
CCR Title 23, Sec 2644.1(a)(5)

✔✔A permit to operate a UST system must have all of the following listed on the permit,
EXCEPT:
a.) The state UST identification number(s)
b.) Name of the tank manufacturer and tank capacity
c.) Permit expiration date
d.) Monitoring requirements - ✔✔b.) Name of the tank manufacturer and tank capacity
CCR Title 23, Sec 2712(c)

✔✔A temporary closure is appropriate for which of the following:
a.) The UST system is empty and will be removed from service indefinitely
b.) The UST system has ceased to store hazardous materials but will be used within the
next 12 consecutive months
c.) The UST system is unable to meet compliance requirements and will be removed
d.) The UST system has been red-tagged - ✔✔b.) The UST system has ceased to store
hazardous materials but will be used within the next 12 consecutive months
CCR Title 23, Sec 2671 & 2670

✔✔A local agency determines that a UST facility within the last year had compliance
issues. Prior to issuing a new permit or renewal to operate an UST the local agency
shall:
a.) Ask the state to assist in a joint inspection
b.) Request the owner/operator to submit a "Return to Compliance" form.
c.) Refer to a District Attorney Investigator
d.) Inspect the facility and determine compliance - ✔✔d.) Inspect the facility and
determine compliance
CCR Title 23, Sec 2712(c)

✔✔All the following components require third party certification, except:
a.) Automatic tank gauging systems
b.) Statistical inventory reconciliation methods
c.) Spill Containment lids
d.) Liquid phase out-of-tank products - ✔✔c.) Spill Containment lids

,✔✔The exterior surface of an underground storage tank must bear a marking or label
which shows the following information, except:
a.) Design pressure in psig
b.) Useable capacity in gallons.
c.) Width of the interstitial space
d.) Identity of manufacturer - ✔✔c.) Width of the interstitial space
CCR Title 23, Sec 2631(b)

✔✔Which of the following is not a confined space:
a.) A really deep turbine sump
b.) A space not designed for continuous employee occupancy
c.) An area with limited access
d.) An area with limited ventilation - ✔✔d.) An area with limited ventilation
CCR Title 8, Sec 5157(b)

✔✔A secondary containment system which is not an integral part of primary
containment shall be designed and constructed according to an engineering
specification approved by a third party. The secondary containment system shall
contain ______________ of the volume of the largest primary container within it, in the
case of multiple primary containers:
a.) 100 percent
b.) 10 percent
c.) 110 percent
d.) 150 percent - ✔✔d.) 150 percent
CCR Title 23, Sec 2631(e)(1)(B)

✔✔All the following are approved overfill prevention systems, except:
a.) Automatic shutoff devices
b.) Spill Containers
c.) Overfill alarms
d.) Flapper valves - ✔✔b.) Spill Containers
CCR Title 23, Sec 2635(b)(2)

✔✔Automatic line leak detectors shall be installed on underground pressurized piping
with secondary containment and shall be capable of detecting a:
a.) 3-gallon per hour leak rate at 5 psi within 1 hour.
b.) .1-gallon per hour leak rate at 5 psi within 1 hour.
c.) 3-gallon per hour leak rate at 10 psi within 1 hour.
d.) .1-gallon per hour leak rate at 10 psi within 1 hour. - ✔✔c.) 3-gallon per hour leak
rate at 10 psi within 1 hour.
CCR Title 23, Sec 2636(f)(2)(f)(3) & 2643(c)(1)

✔✔Individuals installing an Underground Storage Tank System shall meet all of the
following, except:
a.) California Licensed Tank Tester

, b.) Possess the appropriate Contractors State License Board license.
c.) Effective January 1, 2005, the individual shall possess a current underground
storage tank system installer certificate from the ICC UST Installation/Retrofitting exam.
d.) The individual has been adequately trained as evidenced by a certificate of training
issued by the manufacturer(s) of the underground storage tank system component(s)
being installed. - ✔✔a.) California Licensed Tank Tester
CCR Title 23, Sec 2715(g)(h)

✔✔Which of the following would not require secondary containment testing?
a.) Interstitial space hydrostatically monitored
b.) Under-dispenser containment
c.) Turbine piping sump
d.) Secondary piping - ✔✔a.) Interstitial space hydrostatically monitored
CCR Title 23, Sec 2637(g)

✔✔Fiberglass tanks shall be repaired by the following, except:
a.) Small fractures and fissures may be repaired with epoxy
b.) Fiberglass cloth with a minimum dimension 12 x 12 inches centered over the area to
be repaired.
c.) A second layer of fiberglass cloth shall be installed directly over the primary cloth
layer and shall be cut to overlap the primary patch by 5 inches on all sides.
d.) The repaired tank shall be tested for tightness within 30 calendar days following the
date of the completion of the repair. - ✔✔c.) A second layer of fiberglass cloth shall be
installed directly over the primary cloth layer and shall be cut to overlap the primary
patch by 5 inches on all sides.
CCR Title 23, Sec 2661(d)(4)

✔✔Automatic line leak detectors shall be installed on underground pressurized piping
and shall be capable of detecting a 3-gallon per hour leak rate at 10 psi within 1 hour
with a probability of detection of at least ______% and a probability of false alarm no
greater than _______%.
a.) 95, 5
b.) 98, 2
c.) 5, 95
d.) 2, 98 - ✔✔a.) 95, 5
CCR Title 23, Sec 2636(f)(2) & 2643(c)(1)

✔✔An emergency impact valve (shear valve) is found in the following location on an
UST System.
a.) At the turbine piping termination
b.) Base of the dispenser
c.) Under the extractor tee
d.) Spill container - ✔✔b.) Base of the dispenser

Document information

Uploaded on
January 25, 2026
Number of pages
20
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK
3.5
(41)
Sold
287
Followers
11
Items
36004
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions