• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

CEPSCI || 100% Errorless Answers.

Document preview thumbnail
Preview 2 out of 6 pages

CEPSCI || 100% Errorless Answers.

Content preview

CEPSCI || 100% Errorless Answers.
Erosion correct answers The process by which the land surface is worn away by the action of
water wind ice and gravity.

Factors contributing to erosion correct answers Climate (rain frequency), Season (storms in
summer), vegetative cover, topography, soil characteristics.

Sedimentation correct answers Process by which eroded material is transported and deposited

Sedimentation effects: correct answers reduces water clarity, fills up ponds/reservoirs, pollutants
attached to sediment impact water quality.

1972 Clean Water Act correct answers Administered by EPA, created the National Pollutant
Discharge Elimination System (NPDES)

NPDES in South Carolina correct answers SC is an NPDES delegated state. NPDES regulations
are administered by South Carolina Department of Health and Environmental Control (DHEC).

epa DOES HAVE authority to exert jurisdiction in SC.

Department of Health and Environmental Control (DHEC) correct answers state body that
administers NPDES regulations. Construction General Permit is administered by DHEC

Construction General Permit correct answers Affects both small and large construction activities.
Must be obtained for land disturbing activities of:
- 1 acre or greater
- Less than 1 acre but within a 1/2 mile of a water body in the coastal counties)
- Less than 1 acre of total land area that is part of a larger common plan of development if the
development will end up disturbing more than 1 acre.

Operator categories: correct answers Primary permittee: developer, land owner, site operator,
public/private entity

Secondary Permittee: Residential builder, lot owner

Contractors

lending institutions

Primary Permittee correct answers They have operational control over Stormwater Pollution
Prevention Plan (SWPPP), construction plans, and specifications.

typically owner or developer

, How to obtain coverage under Construction General Permit: correct answers 1. Submit a Notice
of Intent
2. Preparation of the Comprehensive Stormwater Pollution Prevention Plan (C-SWPPP)

Secondary Permittee correct answers Conducts land disturbing activity limited to an individual
lot or group of lots. This is Ryan Homes

Contractors correct answers Employed by the primary or secondary permittees. Before starting
work, they must participate in pre-construction conference and complete Pre-Construction
Conference Certification Form

As well as a Contractor Certification Form

Lending Institution correct answers If a bank or government entity takes over a site due to
forclosure, they become responsible for site discharge

Stormwater Pollution Prevention Plans correct answers SWPPP is a site specific document that:
- identifies sources of stormwater pollution
- describes control measure to reduce pollutants in site discharge
- identifies procedures for the operator to implement to comply with CGP

Comprehensive SWPPP vs. On-Site SWPPP correct answers Comprehensive: includes
calculations

On-Site: includes certification forms and records/logs.

They otherwise both have a narrative, maps, sequences, and Notices of Intent

On-Site SWPPP correct answers must be kept on site or posted near main entrance.

Must include:

1. DHEC Construction General Permit
2. Notice of Intent
3. NPDES Coverage Approval Letter
4. Pre-Construction Conference Certification Forms
5. Contractor Certifications

How long to revise an OS-SWPPP if its determined ineffective? correct answers 7 calendar days
to make revisions.

Minor Modifications in OS-SWPPP correct answers can be made directly in the field. Record in
OS-SWPPP and have it inspected, don't need approval by DHEC.

Inspections of SWPPP correct answers Look for the following:
1. areas of site distrubed by construction activity

Document information

Uploaded on
January 25, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.19

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton
3.7
(118)
Sold
807
Followers
438
Items
40068
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions