• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

Conventional septic system installer exam with correct answers

Document preview thumbnail
Preview 3 out of 19 pages

Conventional septic system installer exam with correct answers

Content preview

Conventional septic system installer ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




exam with correct answers ||\\||\\ ||\\||\\ ||\\||\\




Accessible community sewer - correct answers✔✔Means ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




a public sewerage system where it's utilization by a given
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




piece of property is not limited because of physical or
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




other features as determined by the commissioner
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




Advanced treatment system (ATS) - correct ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




answers✔✔Means an approved treatment device in ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




compliance with rule 0400-48-01-10 that is separate and ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




distinct from the disposal field and is used to improve the
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




quality of septic thank effluent to secondary levels
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




Agency of government - correct answers✔✔In the
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




context of public sewerage systems, means state, county,
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




and municipal government agencies including their
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




subdivisions and utility districts, but does not include ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




entities regulated by the Tennessee regulatory authority.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\

,Air/Vacuum Relief Valves - correct answers✔✔Means a ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




device that allows the air in a distribution system to ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




escape during pressurized flow, and allows air to enter the ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




system durning depressurized flow
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




Alternate methods of disposal - correct ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




answers✔✔Means a subsurface sewage disposal system, ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




the construction, installation, and operation of which
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




varies from that of a conventional subsurface sewage
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




disposal system. ||\\||\\




Blockout - correct answers✔✔Means a potential access ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




hole which is a think section of concrete preformed in a
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




septic tank which can be removed to allow insertion of a
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




four to six inch pipe ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




Boundary outline - correct answers✔✔Means a map or ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




chart with lines delineating the boundaries of the
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




proposed area or parcel of land ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\

, Buffer zone - correct answers✔✔Means the distance
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




between subsurface sewage disposal systems or ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




subsystems required to alleviate the impact of hydraulic ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




overloading from the adjacent system ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




Commissioner - correct answers✔✔Means the ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




commissioner of environment and conservation, the ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




commissioners duly authorized representative, and in the ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




event of commissioners absence or a vacancy in the office
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




of commissioner, the deputy commissioner
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




Comventional sand filter - correct answers✔✔Means a ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




filter with two(2) feet or more of medium sand designed
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




to chemically and biologically process septic tank or other
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




treatment unit effluent from a pressure distribution ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




system operated on an intermittent basis. ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




Conventional subsurface sewage, disposal system - ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




correct answers✔✔Means a disposal system that pre- ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




treat sewage by use of septic tank and applies effluent to
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\




the soil as described in rule 0400-48-01-07
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\

Document information

Uploaded on
January 23, 2026
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$25.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
progrades
4.0
(2)
Sold
17
Followers
0
Items
4053
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions