Septic Tanks exam with correct answers ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
What are the two major parts of a basic individual onsite
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
wastewater treatment system? ||\\||\\ ||\\||\\
a. Septic tank and Effluent filter
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
b. Septic tank and soil adsorption system (usually a leach
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
field)
c. Collection system and Septic tank
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
d. Collection system and Activated Sludge System
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
b. Septic tank and soil adsorption system (usually a leach
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
field)
Which of the following is not an approved Conventional
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
SSDS Substitute Product?
||\\||\\ ||\\||\\
a. Large Diameter Gravelless Pipe (LDGP)
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
b. Chambers
||\\||\\
c. Expanded Polystyrene (EPS)
||\\||\\ ||\\||\\ ||\\||\\
d. Peat moss
||\\||\\ ||\\||\\
d. Peat moss
||\\||\\ ||\\||\\
Tennessee Regs allow both single-compartment and two- ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
compartment septic tanks. ||\\||\\ ||\\||\\
, a. True ||\\||\\
b. False ||\\||\\
b. False ||\\||\\
1. Which of the following statements about alternative
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
methods of subsurface sewage disposal systems is false? ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
a. An LPP system is a shallow, pressure-dosed system with
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
a network of small diameter perforated pipes
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
b. A mound system is a soil absorption system that is
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
located below the natural soil surface ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
c. Lagoon systems require a minimum of 5 acre tract and a
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
minimum of 5 ft. heavy clay
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
d. Subsurface drip disposal systems rely on gravity for the
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
uniform application of treated effluent throughout the ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
disposal field ||\\||\\
d. Subsurface drip disposal systems rely on gravity for the
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
uniform application of treated effluent throughout the ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
disposal field ||\\||\\
Which of the following septic tank construction material is||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
not allowed in Tennessee?
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
a. Concrete ||\\||\\
What are the two major parts of a basic individual onsite
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
wastewater treatment system? ||\\||\\ ||\\||\\
a. Septic tank and Effluent filter
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
b. Septic tank and soil adsorption system (usually a leach
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
field)
c. Collection system and Septic tank
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
d. Collection system and Activated Sludge System
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
b. Septic tank and soil adsorption system (usually a leach
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
field)
Which of the following is not an approved Conventional
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
SSDS Substitute Product?
||\\||\\ ||\\||\\
a. Large Diameter Gravelless Pipe (LDGP)
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
b. Chambers
||\\||\\
c. Expanded Polystyrene (EPS)
||\\||\\ ||\\||\\ ||\\||\\
d. Peat moss
||\\||\\ ||\\||\\
d. Peat moss
||\\||\\ ||\\||\\
Tennessee Regs allow both single-compartment and two- ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
compartment septic tanks. ||\\||\\ ||\\||\\
, a. True ||\\||\\
b. False ||\\||\\
b. False ||\\||\\
1. Which of the following statements about alternative
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
methods of subsurface sewage disposal systems is false? ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
a. An LPP system is a shallow, pressure-dosed system with
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
a network of small diameter perforated pipes
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
b. A mound system is a soil absorption system that is
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
located below the natural soil surface ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
c. Lagoon systems require a minimum of 5 acre tract and a
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
minimum of 5 ft. heavy clay
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
d. Subsurface drip disposal systems rely on gravity for the
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
uniform application of treated effluent throughout the ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
disposal field ||\\||\\
d. Subsurface drip disposal systems rely on gravity for the
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
uniform application of treated effluent throughout the ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
disposal field ||\\||\\
Which of the following septic tank construction material is||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
not allowed in Tennessee?
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
a. Concrete ||\\||\\