CM 4221 QUIZ 1-6 TEST QUESTIONS AND CORRECT ANSWERS
An EIS: What is it? The ANSWER A report created to outline how planned
development projects might affect the local physical and ecological
surroundings
Which of the following does not involve obtaining a constructor? The
ANSWER Contracting for job orders
The chance that the main project systems (such as the HVAC and electrical
systems) will function in accordance with the project's goals, plans, and
requirements is decreased by this testing procedure. ANSWER
Commissioning
While horizontal infrastructure projects are usually conceived and engineered
by design engineers, vertical building projects are first designed by architects. -
ACCEPTABLE
Laws and regulations require privately funded projects to hire a construction
company through competitive bidding. ANSWER Untrue
Two management tasks that take place throughout a project's engineering and
design phase are scoping and planning. - ACCEPTABLE
A project manager and a program manager are interchangeable. ANSWER
Untrue
The low bid method of procurement is used to choose a contractor based only
on the overall cost of construction. - ACCEPTABLE
Which of the following does not describe integrated project delivery as a
drawback?
a. No single point of accountability b. Federally sponsored projects cannot have
multi-party agreements c. obtaining insurance is costly and complex d. None of
these e. No legal precedent - ANSWER Not one of these
This procurement process chooses a construction company for a project based
on technical and financial considerations. The ANSWER The best deal
An EIS: What is it? The ANSWER A report created to outline how planned
development projects might affect the local physical and ecological
surroundings
Which of the following does not involve obtaining a constructor? The
ANSWER Contracting for job orders
The chance that the main project systems (such as the HVAC and electrical
systems) will function in accordance with the project's goals, plans, and
requirements is decreased by this testing procedure. ANSWER
Commissioning
While horizontal infrastructure projects are usually conceived and engineered
by design engineers, vertical building projects are first designed by architects. -
ACCEPTABLE
Laws and regulations require privately funded projects to hire a construction
company through competitive bidding. ANSWER Untrue
Two management tasks that take place throughout a project's engineering and
design phase are scoping and planning. - ACCEPTABLE
A project manager and a program manager are interchangeable. ANSWER
Untrue
The low bid method of procurement is used to choose a contractor based only
on the overall cost of construction. - ACCEPTABLE
Which of the following does not describe integrated project delivery as a
drawback?
a. No single point of accountability b. Federally sponsored projects cannot have
multi-party agreements c. obtaining insurance is costly and complex d. None of
these e. No legal precedent - ANSWER Not one of these
This procurement process chooses a construction company for a project based
on technical and financial considerations. The ANSWER The best deal