100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

alabama,

Rating
-
Sold
-
Pages
34
Grade
A+
Uploaded on
18-01-2026
Written in
2025/2026

Exam of 34 pages for the course finance at finance (alabama,)

Institution
Finance
Course
Finance











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Finance
Course
Finance

Document information

Uploaded on
January 18, 2026
Number of pages
34
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ALABAMA (AL) DRAINAGE & CULVERT CONTRACTOR PRACTICE EXAM LATEST QUESTIONS
AND CORRECT ANSWERS GRADE A



**1. According to Alabama state regulations, what is the minimum required bond amount
for a Drainage & Culvert contractor?**

A) $5,000

B) $10,000

C) $15,000

D) $20,000



**Answer: B**

**Explanation:** Alabama Code § 34-14-10 requires a minimum $10,000 surety bond for
drainage and culvert contractors licensed by the Alabama Licensing Board for General
Contractors.



**2. Which Alabama state agency regulates stormwater management during construction
activities?**

A) Alabama Department of Environmental Management (ADEM)

B) Alabama Department of Transportation (ALDOT)

C) Alabama Soil and Water Conservation Committee

D) All of the above



**Answer: D**

**Explanation:** All three agencies have regulatory authority over stormwater
management, with ADEM administering the NPDES permit program, ALDOT having road
construction standards, and the Conservation Committee overseeing erosion control.

,**3. What is the minimum required pipe cover for culverts under unpaved roads according
to ALDOT standards?**

A) 6 inches

B) 12 inches

C) 18 inches

D) 24 inches



**Answer: B**

**Explanation:** ALDOT Standard Specifications typically require minimum 12 inches of
cover for culverts under unpaved roads, with 24 inches for paved roads.



**4. According to Alabama regulations, what is the maximum allowable velocity for unlined
drainage ditches in sandy soil?**

A) 1.5 feet per second

B) 2.0 feet per second

C) 2.5 feet per second

D) 3.0 feet per second



**Answer: B**

**Explanation:** Alabama Erosion and Sediment Control Handbook recommends
maximum 2.0 fps for sandy soils to prevent erosion.



**5. Which type of pipe is NOT approved for permanent storm drainage installations in
Alabama?**

A) Corrugated polyethylene

B) Reinforced concrete

C) PVC Schedule 40

,D) Corrugated metal with asphalt coating



**Answer: C**

**Explanation:** PVC Schedule 40 is typically not approved for permanent storm drainage;
SDR 35 or stronger PVC is required for structural reasons.



**6. What is the minimum required slope for drainage pipes according to ALDOT
standards?**

A) 0.3%

B) 0.5%

C) 1.0%

D) 2.0%



**Answer: B**

**Explanation:** ALDOT typically requires minimum 0.5% slope (0.5 feet per 100 feet) for
drainage pipes to ensure self-cleaning velocity.



**7. According to Alabama regulations, what is the maximum depth for trench excavation
without shoring in stable soil?**

A) 4 feet

B) 5 feet

C) 6 feet

D) 8 feet



**Answer: B**

**Explanation:** OSHA and Alabama regulations allow maximum 5-foot depth without
shoring in Type A or B soils under certain conditions.

, **8. Which of the following requires a NPDES permit in Alabama?**

A) All drainage projects over 1 acre

B) Projects disturbing more than 1 acre

C) Only projects near waterways

D) Projects over 5 acres only



**Answer: B**

**Explanation:** ADEM requires NPDES permits for construction activities disturbing 1
acre or more of land.



**9. What is the minimum required thickness for galvanized corrugated metal pipe (CMP)
under roads in Alabama?**

A) 16 ga

B) 14 ga

C) 12 ga

D) 10 ga



**Answer: A**

**Explanation:** ALDOT typically requires minimum 16 ga galvanized CMP for most
applications, with thicker gauges for higher loads or corrosive conditions.



**10. According to Alabama regulations, how often must erosion control measures be
inspected?**

A) Daily

B) Weekly

C) After each rain event
$81.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
6lairbowwow33

Get to know the seller

Seller avatar
6lairbowwow33 Notes
View profile
Follow You need to be logged in order to follow users or courses
Sold
New on Stuvia
Member since
5 days
Number of followers
0
Documents
8
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions