1. What is the defining characteristic of the design-build delivery
method?
Single contract for both design and construction
Design-build integrates responsibility under one entity.
2. What is the primary advantage of design-build compared to
design-bid-build?
Improved collaboration and reduced project delivery time
Early contractor involvement streamlines decisions.
3. In design-build, who holds the contract with the owner?
The design-builder
The design-builder is the single point of responsibility.
4. What does “single point of responsibility” mean?
One entity is accountable for both design and construction
This reduces owner risk.
5. What organization promotes Design-Build Done Right® best
practices?
Design-Build Institute of America (DBIA)
DBIA sets industry standards.
6. What is Design-Build Done Right®?
A set of best practices for successful design-build projects
It emphasizes collaboration, trust, and alignment.
7. What is the owner’s primary role in design-build?
Defining project goals and performance criteria
Clear owner requirements are critical.
8. What document defines the owner’s expectations in design-build?
Owner’s Project Requirements (OPR)
OPR guides the design-builder.
, 9. What is a key responsibility of the design-builder?
Managing both design and construction processes
Integration is essential.
10. What delivery method best supports fast-track construction?
Design-build
Design and construction can overlap.
11. What procurement method emphasizes qualifications over
price?
Qualifications-Based Selection (QBS)
DBIA recommends QBS when allowed.
12. What is the preferred procurement approach under DBIA
best practices?
Best-value selection
Balances price and qualifications.
13. What is a Request for Qualifications (RFQ) used for?
Shortlisting qualified design-build teams
RFQs focus on experience.
14. What is a Request for Proposals (RFP) used for?
Evaluating technical and price proposals
RFPs define selection criteria.
15. What should evaluation criteria be in design-build
procurement?
Clear, measurable, and aligned with project goals
Transparency improves outcomes.
16. What is a stipend in design-build procurement?
Compensation for shortlisted teams’ proposal efforts
Encourages innovation and fairness.
17. What DBIA contract document is commonly used for design-
build?
DBIA Standard Form of Agreement
These reflect best practices.