Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 3 pages
Exam (elaborations)

MGSC 395 Exam 2 Branner Complete Questions With Accurate Answers Graded A+.

Document preview thumbnail
Preview 1 out of 3 pages

Capacity - correct answers The maximum rate of output of a process or a system Measures of Capacity - correct answers Input and Output Input Examples: Hospital - number of beds, Airline - number of planes, Restaurant - number of seats Output Examples: Hospital - number of patients treated per day, Airline - seat miles flown per day, Restaurant - customers served per day Utilization - correct answers The degree to which equipment, space, or labor is being used Economies of Scale - correct answers The average unit of cost of a service or goods can be reduced by increasing its output rate Diseconomies of Scale - correct answers A facility can become so large that the average cost per unit increases as the facility's size increases Capacity Cushion - correct answers The amount of reserve capacity a process uses to handle sudden increases in demand or temporary losses of production capacity Expansionist Strategy - correct answersStays ahead of demand; can preempt the expansion of other firms Little's Law - correct answersLaw that states the number of customers in a waiting-line system to the arrival rate and waiting time of customers Bottleneck - correct answersA type of constraint that is defined as any resource whose available capacity limits the organization's ability Seven Key Principles of the Theory of Constraints (Most important: 1 & 4) - correct answers1. The focus should be on balancing flow, not on balancing capacity. 2. Maximizing the output and efficiency of every resource may not maximize the throughput of the entire system. 3. An hour lost at a bottleneck or constrained resource is an hour lost for the whole system. In contrast, an hour saved at a non-bottleneck resource is a mirage, because it does not make the whole system more productive. 4. Inventory is needed only in front of bottlenecks to prevent them from sitting idle and in front of assembly and shipping points to protect customer schedules 5. Work should be released into the system only as frequently as needed by the bottlenecks. Bottleneck flows should be equal to the market demand. 6. Activating a non-bottleneck resource is not the same as utilizing a bottleneck resource. It doesn't increase throughput or promote better performance. 7. Every capital investment must be viewed from the perspective of the global impact on overall throughput, inventory, and operating e Traditional Method - correct answers Select the product mix according to the highest overall contribution margin of each product Bottleneck Method - correct answers Select the product mix according to the dollar contribution margin per minute of processing time at the bottleneck Line Balancing - correct answers the assignment of work to stations in a line process so as to achieve the desired output rate with the smallest number of workstations Objective Function - correct answers What is being maximized or minimized (mathematically); provides the scorecard which attractiveness of different solutions is judged Constraints - correct answers Limitations that restrict the permissible choices for the decision variables Linearity - correct answers A characteristic of linear programming models that implies proportionality and additivity—there can be no products or powers of decision variables. Nonnegativity - correct answers- The decision variables must be positive or zero. - Expressed as ≥ 0 constraint for each decision variable Critical Path - correct answers The sequence of activities in a project that is expected to take the longest to complete Activity Slack - correct answers The maximum length of time that an activity can be delayed without delaying the entire project Earliest Start - correct answers Earliest Finish of previous activity Earliest Finish - correct answers Earliest Start + Estimated Time Latest Start - correct answers Latest Finish - Estimated Time Latest Finish - correct answers Latest Start of activity that immediately follows

Content preview

MGSC 395 Exam 2 Branner

Capacity - correct answers The maximum rate of output of a process or a system



Measures of Capacity - correct answers Input and Output

Input Examples: Hospital - number of beds, Airline - number of planes, Restaurant - number of seats

Output Examples: Hospital - number of patients treated per day, Airline - seat miles flown per day,
Restaurant - customers served per day



Utilization - correct answers The degree to which equipment, space, or labor is being used



Economies of Scale - correct answers The average unit of cost of a service or goods can be reduced by
increasing its output rate



Diseconomies of Scale - correct answers A facility can become so large that the average cost per unit
increases as the facility's size increases



Capacity Cushion - correct answers The amount of reserve capacity a process uses to handle sudden
increases in demand or temporary losses of production capacity



Expansionist Strategy - correct answersStays ahead of demand; can preempt the expansion of other
firms



Little's Law - correct answersLaw that states the number of customers in a waiting-line system to the
arrival rate and waiting time of customers



Bottleneck - correct answersA type of constraint that is defined as any resource whose available capacity
limits the organization's ability

Document information

Uploaded on
January 13, 2026
Number of pages
3
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
RealGrades
4.0
(26)
Sold
197
Followers
52
Items
12331
Last sold
3 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions