And 100% Correct Answers
\Q\.Hierarchy of construction documents (least to most) - ANSWERS✔-Standard drawings,
Standard specs, Supplemental specs, Plans, Special provisions, Special provisions copied notes
\Q\.Which construction documents details approved additions and revisions to the standard
spec - ANSWERS✔-Supplemental specs
\Q\.This ensures an adequate bond between the existing pavement surface and the new asphalt
overlay so that slippage and delamination do not occur - ANSWERS✔-Tack coat
\Q\.Which tack coat can be used prior to May and after September? - ANSWERS✔-Conventional
\Q\.Which tack coat can be used year round, and must be used from May through September? -
ANSWERS✔-Trackless
\Q\.What is the range of proper tack coat application? (in gal/yd^2) - ANSWERS✔-.05 to .10
\Q\.Proper tack coat will leave a residual asphalt cement content ranging from approximately...?
(in gal/yd^2) - ANSWERS✔-.04 to .06
\Q\.Most asphalt emulsions contain __% to __% residual asphalt cement - ANSWERS✔-60, 65