100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

NERC Reliability Coordinator (RC) Certification Exam A&B ALL QUESTIONS AND CORRECT ANSWERS LATEST UPDATE THIS YEAR

Rating
-
Sold
-
Pages
161
Grade
A+
Uploaded on
08-01-2026
Written in
2025/2026

Tap on AVAILABLE IN BUNDLE / PACKAGE DEAL to unlock free bonus exams — save more while getting everything you need! NERC Reliability Coordinator (RC) Certification Exam A & B – All Questions and Correct Answers (Latest Update This Year) is a fully updated, comprehensive study resource designed for professionals preparing for both versions of the NERC RC Certification Exam. It includes all exam-style questions with correct answers, aligned with current NERC standards, reliability principles, and industry best practices. Coverage includes real-time operations, system monitoring and control, emergency operations, contingency analysis, transmission and generation coordination, reliability standards, and scenario-based decision-making. This resource reinforces critical concepts required for maintaining bulk electric system reliability. Ideal for system operators, reliability coordinators, power industry professionals, and certification candidates, this guide supports complete exam preparation, strengthens operational knowledge, and boosts confidence for successful certification outcomes.

Show more Read less
Institution
NERC RC
Course
NERC RC











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NERC RC
Course
NERC RC

Document information

Uploaded on
January 8, 2026
Number of pages
161
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Page 1 of 161



NERC Reliability Coordinator (RC) Certification
Exam A&B ALL QUESTIONS AND CORRECT
ANSWERS LATEST UPDATE THIS YEAR
NERC Reliability Coordinator (RC) Certification Exam


QUESTION: In an Interconnection, which of the following is required to be in the metered

boundaries of a Balancing Authority Area?




A. Generation


B. Transmission


C. Load


D. All are required to be within the metered boundaries of a Balancing Authority. - ANSWER-D.

All are required to be within the metered boundaries of a Balancing Authority.




QUESTION: The minimum compliance for NERC Disturbance Control Standard (DCS) is

________?




A. 90% of all reportable disturbances




1

, Page 2 of 161


B. 90% of all disturbances


C. 100% for all reportable disturbances


D. 100% for all generator tips - ANSWER-C. 100% for all reportable disturbances




QUESTION: A Balancing Authority has a normal load of around 8500 MW. Its most severe single

contingency is a 700 MW coal-fired steam unit. At 0810, the ACE value was at -55 MW when a

600 MW generator in the Balancing Authority's northern area tripped off line due to a

generator differential. This event resulted in a large negative ACE for the Balancing Authority.

What value must ACE return to and in what time frame to avoid a DCS violation?




A. -55 MW ACE in 15 minutes


B. Zero ACE in 10 minutes


C. -55 MW ACE in 10 minutes


D. Zero ACE in 15 minutes - ANSWER-A. -55 MW ACE in 15 minutes




QUESTION: If a Reserve Sharing Group member has experienced a Reportable Disturbance

condition but does not call for reserve activation from other members, the entire group is

considered to be in a disturbance condition.


2

, Page 3 of 161




A. True


B. False - ANSWER-B. False




QUESTION: Turbine governors arrest Frequency deviations. Of the following, which control

system compares and brings Net Actual Interchange back in line or as close to Net Scheduled

Interchange as possible?




A. Load Response


B. Flat Frequency Control


C. Automatic Generation Control


D. Automatic Voltage Regulation - ANSWER-C. Automatic Generation Control




QUESTION: Automatic Generation Control uses the ACE equation to ________.




A. Minimize Inadvertent Interchange among Balancing Authority areas




3

, Page 4 of 161


B. Provide frequency support for the Interconnection


C. Both answers are correct


D. Neither answer is correct - ANSWER-C. Both answers are correct




QUESTION: Which part of the ACE equation reflects Pseudo-Ties values?




A. Scheduled Net Interchange component, NIS


B. Actual Net Interchange component, NIA


C. Frequency component, FA - FS


D. Pseudo-Ties are not included in the ACE equation. - ANSWER-B. Actual Net Interchange

component, NIA




Q; When does the Contingency Reserve Restoration Period begin?




A. At the top of the hour after the Reportable Disturbance


B. At the start of the Reportable Disturbance




4

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
HustlingORPHANpleaseHelpp Walden University
View profile
Follow You need to be logged in order to follow users or courses
Sold
6420
Member since
3 year
Number of followers
63
Documents
2803
Last sold
4 days ago

4.2

27 reviews

5
15
4
5
3
6
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions