F-60 FIRE GUARD 2026 EXAM QUESTIONS AND
ANSWERS GRADED A+
✔✔TORCH-APPLIED ROOF SYSTEM - ✔✔Bituminous (沥青) roofing systems using
membranes that are
adhered by heating with a torch and melting asphalt back coating instead of mopping
hot
asphalt for adhesion
✔✔usually it is not the flame that causes a fire. instead - ✔✔it is the thousands of
sparks and pieces of hot
metal that are generated when using the torch. The sparks and pieces of hot metal are
all
possible sources of ignition.
✔✔if u got hot work operation with citywide permit, the owner of the
premises(land,house) of the hot work operation areas must be notified in writing (paper)
by the citywide permit holder at least ____________________ - ✔✔48 hours before the
hot work is to be started.
✔✔The responsible person 's job are? - ✔✔1) ensure that the hot work is performed in
compliance with the terms and conditions of the permit.
2) The person should inspect the hot work site prior to issuing the hot work
authorization, to ensure that it is a fire safe area.
3)He/she also need to periodically monitor the work ,to ensure there are no fire safety
hazards
✔✔The pre-hot work check must be conducted by the ___________ before hot work is
authorized and at least _____________. - ✔✔responsible person ,
once per day
✔✔pre-hot work need a check report and must at the work site during the work, made
available for inspection by a representative of the FDNY,
and maintained on the premises for a minimum of _______________________ - ✔✔48
hours after work is complete
✔✔A pre-hot work check must be conducted at least ____________ and must verify the
following:
1. The ______________ is in good working order.
2. The hot work area is clear of __________________.
(1) __________ rule for cutting or welding operation
(2) __________ rule for other hot work operation - ✔✔once per day,
, hot work equipment ,
combustibles and flammable solids,
35 feet ,
25 feet
✔✔Sprinkler system protection _______________ while hot work is
performed. Where hot work is performed close to sprinklers, noncombustible barriers or
damp cloth guards shall shield the individual sprinkler heads,
and damp cloth shall be removed when the work is completed. - ✔✔must not be shut off
or impaired
✔✔If the work extends over several days, the shields shall be _______________ -
✔✔removed at the end of each workday.
✔✔Fire detection systems it should
_________________during hot work operation
___________ of the alarm is disabled, operator's __________ , and the
_____________ alarm is reenabled must notify to the central station, need to log book
each time u do this.
fire watch man, suffer ______________ must be provided when alarm is disabled -
✔✔disabled the fire alarm ,
date n time,
name n number,
date n time ,
any impariment/hurt
✔✔G-60 certificates of fitness is required for - ✔✔torch operations using oxygen and a
flammable gas
✔✔G-60 or G-41 or G-42 certificates of fitness is required - ✔✔torch applied roof
system.
✔✔F-60 certificates of fitness fire guard is required - ✔✔to perform the fire watch for
torch
operations at
(a) construction sites,
(b) on any rooftop,
(c) in any building or
structure, when the torch operation is conducted by a person holding a citywide permit
for torch operations
✔✔Portable LPG containers that are more than _________ oz must not stored,
handled, or used indoors in residential occupancies, factory and industrial occupancies,
ANSWERS GRADED A+
✔✔TORCH-APPLIED ROOF SYSTEM - ✔✔Bituminous (沥青) roofing systems using
membranes that are
adhered by heating with a torch and melting asphalt back coating instead of mopping
hot
asphalt for adhesion
✔✔usually it is not the flame that causes a fire. instead - ✔✔it is the thousands of
sparks and pieces of hot
metal that are generated when using the torch. The sparks and pieces of hot metal are
all
possible sources of ignition.
✔✔if u got hot work operation with citywide permit, the owner of the
premises(land,house) of the hot work operation areas must be notified in writing (paper)
by the citywide permit holder at least ____________________ - ✔✔48 hours before the
hot work is to be started.
✔✔The responsible person 's job are? - ✔✔1) ensure that the hot work is performed in
compliance with the terms and conditions of the permit.
2) The person should inspect the hot work site prior to issuing the hot work
authorization, to ensure that it is a fire safe area.
3)He/she also need to periodically monitor the work ,to ensure there are no fire safety
hazards
✔✔The pre-hot work check must be conducted by the ___________ before hot work is
authorized and at least _____________. - ✔✔responsible person ,
once per day
✔✔pre-hot work need a check report and must at the work site during the work, made
available for inspection by a representative of the FDNY,
and maintained on the premises for a minimum of _______________________ - ✔✔48
hours after work is complete
✔✔A pre-hot work check must be conducted at least ____________ and must verify the
following:
1. The ______________ is in good working order.
2. The hot work area is clear of __________________.
(1) __________ rule for cutting or welding operation
(2) __________ rule for other hot work operation - ✔✔once per day,
, hot work equipment ,
combustibles and flammable solids,
35 feet ,
25 feet
✔✔Sprinkler system protection _______________ while hot work is
performed. Where hot work is performed close to sprinklers, noncombustible barriers or
damp cloth guards shall shield the individual sprinkler heads,
and damp cloth shall be removed when the work is completed. - ✔✔must not be shut off
or impaired
✔✔If the work extends over several days, the shields shall be _______________ -
✔✔removed at the end of each workday.
✔✔Fire detection systems it should
_________________during hot work operation
___________ of the alarm is disabled, operator's __________ , and the
_____________ alarm is reenabled must notify to the central station, need to log book
each time u do this.
fire watch man, suffer ______________ must be provided when alarm is disabled -
✔✔disabled the fire alarm ,
date n time,
name n number,
date n time ,
any impariment/hurt
✔✔G-60 certificates of fitness is required for - ✔✔torch operations using oxygen and a
flammable gas
✔✔G-60 or G-41 or G-42 certificates of fitness is required - ✔✔torch applied roof
system.
✔✔F-60 certificates of fitness fire guard is required - ✔✔to perform the fire watch for
torch
operations at
(a) construction sites,
(b) on any rooftop,
(c) in any building or
structure, when the torch operation is conducted by a person holding a citywide permit
for torch operations
✔✔Portable LPG containers that are more than _________ oz must not stored,
handled, or used indoors in residential occupancies, factory and industrial occupancies,