Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

AS 411 EXAM 1 QUIZ QUESTIONS & ANSWERS

Document preview thumbnail
Preview 1 out of 2 pages

AS 411 EXAM 1 QUIZ QUESTIONS & ANSWERS

Content preview

AS 411 EXAM 1 QUIZ QUESTIONS & ANSWERS

1. The minimum amount of pavement required for a 180° turn is (B737) - Answers -79
feet

Maximum Takeoff Weight is - Answers -172,500 lbs

Entry and cargo doors should not be operated in winds at more than - Answers -True

The guarded emergency lights switch on the aft flight attendants panel overrides the
flight deck switch. - Answers -True

The maximum altitude for APU operation is - Answers -FL410

The maximum altitude for APU operation for bleed air to supply one pack in flight -
Answers -17,000 ft

During APU operation, fuel is automatically heated to prevent icing - Answers -True

The APU should operate for ______________ before a bleed air load is applied. -
Answers -1 minute

An immediate shut down of the APU can be accomplished by - Answers -Pulling the
APU fire switch

If the APU is the only source of electrical power in flight - Answers -All galley buses and
service buses are automatically shed

Electrical power for the 737 is provided by - Answers -two integrated drive generators
with an APU and battery backup

Which of the statements below is one of the basic operating principles of the 737
electrical system - Answers -There is no paralleling of the AC sources of power.

The integrated drive generator (IDG) - Answers -maintains a constant generator speed
throughout the normal operating range of the engine

The AC power system consists of - Answers -maintains a constant generator speed
throughout the normal operating range of the engine

The following is an example of the "last on" concept. Ground power is connected, the
APU is running, the pilot selects an APU GEN switch ON and then has to select the
GRD PWR switch to OFF in order to disconnect the ground. - Answers -False

Document information

Uploaded on
January 4, 2026
Number of pages
2
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$9.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Greaterheights
4.0
(222)
Sold
1162
Followers
882
Items
20625
Last sold
6 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions