• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 20 pages
Exam (elaborations)

SAFe Advanced Scrum Master Practice Test (2026 ).

Document preview thumbnail
Preview 3 out of 20 pages

SAFe Advanced Scrum Master Practice Test (2026 ).

Content preview

SAFe Advanced Scrum Master
Practice Test (4.6) | 2026 –
Why should team members continuously and actively engage with other teams during
PI Planning? - ANSWER---- camila answer: C or A5'
-C
--A
A.To manage dependencies and resolve impediments

B. To understand how the other team is working

C. To foster an environment of capacity and velocity

D. To create a backlog of features the team can adopt
--
https://www.scaledagileframework.com/pi-planning/

`What are two Release Train Engineer responsibilities? (Choose two.) - ANSWER----
camila answer: A & C*


A. Facilitate PI Planning readiness and the event itself

B. Understand Customer needs; validate solutions

C. Drive relentless improvement through Inspect and Adapt

D. Build an effective Product Owner / Product Manager team

E. Manage and prioritize the flow of work to the program
--
https://www.scaledagileframework.com/release-train-engineer-and-solution-train-
engineer/

`What anti-pattern can emerge during the Scrum of Scrums? - ANSWER---- camila
answer: D*


A. Scrum Masters bring in risks and impediments for escalation

B. Scrum Masters work with the Release Train Engineer to resolve risks and
impediments

,C. Scrum Masters have a daily 15 minute meet-after with the Release Train Engineer

D. Scrum Masters report on the teams' task status each day
--
https://www.agilest.org/scaled-agile/scrum-of-scrums/
--
https://www.scaledagileframework.com/scrum-master/

`What action should be taken on Relentless Improvement Backlog items from the
Problem Solving Workshop? - ANSWER---- camila answer: C * >


A. Assign points or prioritization levels

B. Calculate for cost before continuing

C. Use as direct input into the PI Planning session that follows

D. Assign to the team best suited to solve
--
https://www.scaledagileframework.com/inspect-and-adapt/

`According to Daniel Pink, which three factors drive motivation and lead to better
performance and personal satisfaction? (Choose three.) - ANSWER---- *camila answer:
B, C, F

A. Reward
B. Mastery
C. Purpose
D. Recognition
E. Responsibility
F. Autonomy
--
https://www.scaledagileframework.com/unlock-the-intrinsic-motivation-of-knowledge-
workers/

`Which statement is true about the phase-gate milestone model and risk reduction? -
ANSWER---- camila answer: A*

A. It does not mitigate risk as intended
B. It creates large batches of requirements
C. It reduces product increment values
D. It helps to visualize and limit WIP
--
https://www.scaledagileframework.com/base-milestones-on-objective-evaluation-of-
working-systems/

, `When does the Inspect and Adapt event happen? - ANSWER---- camila answer: D

A. At the end of the System Demo
B. At the end of every two weeks
C. At the end of the second day of PI Planning
D. At the end of each PI
--
https://www.scaledagileframework.com/inspect-and-adapt/

`Who reviews the top capabilities for the upcoming PI? - ANSWER---- camila answer:
C*

A. Project Manager
B. Solution Architect/Engineer
C. Solution Management
D. Project Owner
--
https://www.scaledagileframework.com/product-and-solution-management/


`What are three Team Retrospective anti-patterns? (Choose three.) - ANSWER----
*camila answer: A, B, C


A. When the Scrum Master decides what the Retrospective topic(s) will be and directs
the team on specific improvement items to work on

B. When the team's people manager comes in to observe

C. When only part of the team attends

D. When the team commits to working on 1-2 improvement items and adds them to the
next Iteration Backlog

E. When the team reviews their interactions during the last Iteration and identifies 1-2
improvement items to work on as a team

F. When the team reviews their interactions during the last Iteration and identifies 1-2
improvement items for the Product Owner to work on
--
https://www.scaledagileframework.com/iteration-retrospective/

`One of the Scrum Master's main responsibilities is to communicate with management
and outside stakeholders to help the team in what way? - ANSWER---- *camila answer:
B

Document information

Uploaded on
January 1, 2026
Number of pages
20
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LeeErickson
1.5
(2)
Sold
13
Followers
1
Items
3624
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions