Kansas General Contractor Exam
Questions And Correct Answers
(Verified Answers) Plus Rationale 2026
Q&A| Instant Download Pdf
1. Which document typically governs the relationship between a general
contractor and the project owner?
A. Purchase order
B. Change order
C. Shop drawing
D. Construction contract
The construction contract defines the legal rights, responsibilities,
scope of work, and payment terms between the owner and
contractor.
2. Who is primarily responsible for jobsite safety on a construction
project?
A. The project owner
B. The architect
C. The local building inspector
D. The general contractor
The general contractor has overall control of the site and is
responsible for implementing and enforcing safety measures.
3. What is the main purpose of a building permit?
A. To guarantee quality workmanship
B. To provide insurance coverage
C. To ensure compliance with building codes and regulations
D. To approve contractor pricing
, Permits ensure that construction complies with applicable codes,
zoning, and safety regulations.
4. Which type of contract sets a fixed total price for all work?
A. Cost-plus contract
B. Time and materials contract
C. Unit price contract
D. Lump-sum contract
A lump-sum contract establishes a single fixed price for the entire
project.
5. What document details the quality standards and materials required
for a project?
A. Schedule of values
B. Change order
C. Project specifications
D. Bid bond
Specifications describe materials, workmanship standards, and
installation requirements.
6. What is a bid bond intended to guarantee?
A. Completion of the project
B. Payment to subcontractors
C. That the bidder will enter into a contract if awarded
D. Quality of workmanship
A bid bond protects the owner if the contractor refuses to sign the
contract after winning the bid.
7. Who typically prepares construction drawings?
A. The general contractor
B. The architect or engineer
C. The building inspector
D. The owner
Architects and engineers prepare drawings that define the design
and technical requirements.
8. What does OSHA primarily regulate?
A. Building aesthetics
B. Environmental permits
C. Workplace safety and health
, D. Contractor licensing
OSHA sets and enforces safety and health standards for workplaces.
9. Which insurance covers bodily injury or property damage caused by
the contractor’s operations?
A. Workers’ compensation
B. Builder’s risk
C. General liability insurance
D. Professional liability
General liability insurance protects against third-party injury or
property damage claims.
10. What is the purpose of a change order?
A. To cancel a contract
B. To delay the project
C. To modify the scope, cost, or schedule of work
D. To approve final payment
Change orders formally document changes agreed upon after the
contract is executed.
11. Which party usually obtains workers’ compensation insurance
for employees?
A. Project owner
B. Architect
C. Employer/contractor
D. Local government
Employers are legally required to carry workers’ compensation
insurance for their employees.
12. What does “means and methods” refer to?
A. Project financing
B. Design intent
C. How the contractor performs the work
D. Inspection procedures
Means and methods are the contractor’s responsibility and involve
construction techniques and sequencing.
13. Which schedule shows the order and duration of construction
activities?
A. Specification schedule
Questions And Correct Answers
(Verified Answers) Plus Rationale 2026
Q&A| Instant Download Pdf
1. Which document typically governs the relationship between a general
contractor and the project owner?
A. Purchase order
B. Change order
C. Shop drawing
D. Construction contract
The construction contract defines the legal rights, responsibilities,
scope of work, and payment terms between the owner and
contractor.
2. Who is primarily responsible for jobsite safety on a construction
project?
A. The project owner
B. The architect
C. The local building inspector
D. The general contractor
The general contractor has overall control of the site and is
responsible for implementing and enforcing safety measures.
3. What is the main purpose of a building permit?
A. To guarantee quality workmanship
B. To provide insurance coverage
C. To ensure compliance with building codes and regulations
D. To approve contractor pricing
, Permits ensure that construction complies with applicable codes,
zoning, and safety regulations.
4. Which type of contract sets a fixed total price for all work?
A. Cost-plus contract
B. Time and materials contract
C. Unit price contract
D. Lump-sum contract
A lump-sum contract establishes a single fixed price for the entire
project.
5. What document details the quality standards and materials required
for a project?
A. Schedule of values
B. Change order
C. Project specifications
D. Bid bond
Specifications describe materials, workmanship standards, and
installation requirements.
6. What is a bid bond intended to guarantee?
A. Completion of the project
B. Payment to subcontractors
C. That the bidder will enter into a contract if awarded
D. Quality of workmanship
A bid bond protects the owner if the contractor refuses to sign the
contract after winning the bid.
7. Who typically prepares construction drawings?
A. The general contractor
B. The architect or engineer
C. The building inspector
D. The owner
Architects and engineers prepare drawings that define the design
and technical requirements.
8. What does OSHA primarily regulate?
A. Building aesthetics
B. Environmental permits
C. Workplace safety and health
, D. Contractor licensing
OSHA sets and enforces safety and health standards for workplaces.
9. Which insurance covers bodily injury or property damage caused by
the contractor’s operations?
A. Workers’ compensation
B. Builder’s risk
C. General liability insurance
D. Professional liability
General liability insurance protects against third-party injury or
property damage claims.
10. What is the purpose of a change order?
A. To cancel a contract
B. To delay the project
C. To modify the scope, cost, or schedule of work
D. To approve final payment
Change orders formally document changes agreed upon after the
contract is executed.
11. Which party usually obtains workers’ compensation insurance
for employees?
A. Project owner
B. Architect
C. Employer/contractor
D. Local government
Employers are legally required to carry workers’ compensation
insurance for their employees.
12. What does “means and methods” refer to?
A. Project financing
B. Design intent
C. How the contractor performs the work
D. Inspection procedures
Means and methods are the contractor’s responsibility and involve
construction techniques and sequencing.
13. Which schedule shows the order and duration of construction
activities?
A. Specification schedule