C795 OA Notes
Common Vulnerabilities and Exposures (CVE) - answer Provides a naming system for
describing security vulnerabilities.
Common Vulnerability Scoring System (CVSS) - answer provides a standardized
scoring system for describing the severity of security vulnerabilities.
Common Configuration Enumeration (CCE) - answer provides a naming system for
system configuration issues.
Common Platform Enumeration (CPE) - answer provides a naming system for operating
systems, applications, and devices.
Extensible Configuration Checklist Description Format (XCCDF) - answer provides a
language for specifying security checklists.
Open Vulnerability and Assessment Language (OVAL) - answerprovides a language for
describing security testing procedures.
Vulnerability scans automatically - answerprobe systems, applications, and networks,
looking for weaknesses that may be exploited by an attacker.
differential backup - answerA type of partial backup that involves copying all changes
made since the last full backup. Thus, each new differential backup file contains the
cumulative effects of all activity since the last full backup.
Electronic Vaulting - answerA storage scenario in which database backups are
transferred to a remote site in a bulk transfer fashion. The remote location may be a
dedicated alternative recovery site (such as a hot site) or simply an offsite location
managed within the company or by a contractor for the purpose of maintaining backup
data
full backup - answerA complete copy of data contained on the protected device on the
backup media.
Full-interruption tests - answeroperate like parallel tests, but they involve actually
shutting down operations at the primary site and shifting them to the recovery site.
Parallel tests - answerrepresent the next level in testing and involve relocating
personnel to the alternate recovery site and implementing site activation procedures.
, Simulation tests - answerare similar to the structured walk-throughs. In simulation tests,
disaster recovery team members are presented with a scenario and asked to develop
an appropriate response without shutting down operations.
Structured walk-through - answertakes testing one step further. In this type of test, often
referred to as a table-top exercise, members of the disaster recovery team gather in a
large conference room and role-play a disaster scenario.
Read-through test - answer-simplest type of DRP test
-copies of the DRP is distributed to members of the disaster recovery team (DRT) for
review
-ensures key personnel are aware of their responsibilities and have knowledge
refreshed
-provides a chance for obsolete info to be updated
-helps update personnel lists
T&A training and awareness - answero Orientation training for all new employees
o Initial training for employees taking on a new disaster recovery role for the first time
o Detailed refresher training for disaster recovery team members
Brief awareness refreshers for all other employees
Disk to Disk - answerdisk storage has become increasingly inexpensive. With drive
capacities now measured in terabytes, tape and optical media can't cope with data
volume requirements anymore. Many enterprises now use disk-to-disk (D2D) backup
solutions for some portion of their disaster recovery strategy.
Software escrow arrangement - answeris a unique tool used to protect a company
against the failure of a software developer to provide adequate support for its products
or against the possibility that the developer will go out of business and no technical
support will be available for the product.
Remote Mirroring - answerMaintaining a live database server at the backup site. It is the
most advanced database backup solution.
Remote Journaling - answerA database backup type which records at the transaction
level
Electronic vaulting scenario - answerdatabase backups are moved to a remote site
using bulk transfers.
Cold Sites (Disaster recovery): - answerA "recovery" cold site is essentially data center
space, with power, and network connectivity that is available when needed. In the event
of a disaster, teams can move and install a business's hardware at the cold site in order
to get the systems back up and running.
Common Vulnerabilities and Exposures (CVE) - answer Provides a naming system for
describing security vulnerabilities.
Common Vulnerability Scoring System (CVSS) - answer provides a standardized
scoring system for describing the severity of security vulnerabilities.
Common Configuration Enumeration (CCE) - answer provides a naming system for
system configuration issues.
Common Platform Enumeration (CPE) - answer provides a naming system for operating
systems, applications, and devices.
Extensible Configuration Checklist Description Format (XCCDF) - answer provides a
language for specifying security checklists.
Open Vulnerability and Assessment Language (OVAL) - answerprovides a language for
describing security testing procedures.
Vulnerability scans automatically - answerprobe systems, applications, and networks,
looking for weaknesses that may be exploited by an attacker.
differential backup - answerA type of partial backup that involves copying all changes
made since the last full backup. Thus, each new differential backup file contains the
cumulative effects of all activity since the last full backup.
Electronic Vaulting - answerA storage scenario in which database backups are
transferred to a remote site in a bulk transfer fashion. The remote location may be a
dedicated alternative recovery site (such as a hot site) or simply an offsite location
managed within the company or by a contractor for the purpose of maintaining backup
data
full backup - answerA complete copy of data contained on the protected device on the
backup media.
Full-interruption tests - answeroperate like parallel tests, but they involve actually
shutting down operations at the primary site and shifting them to the recovery site.
Parallel tests - answerrepresent the next level in testing and involve relocating
personnel to the alternate recovery site and implementing site activation procedures.
, Simulation tests - answerare similar to the structured walk-throughs. In simulation tests,
disaster recovery team members are presented with a scenario and asked to develop
an appropriate response without shutting down operations.
Structured walk-through - answertakes testing one step further. In this type of test, often
referred to as a table-top exercise, members of the disaster recovery team gather in a
large conference room and role-play a disaster scenario.
Read-through test - answer-simplest type of DRP test
-copies of the DRP is distributed to members of the disaster recovery team (DRT) for
review
-ensures key personnel are aware of their responsibilities and have knowledge
refreshed
-provides a chance for obsolete info to be updated
-helps update personnel lists
T&A training and awareness - answero Orientation training for all new employees
o Initial training for employees taking on a new disaster recovery role for the first time
o Detailed refresher training for disaster recovery team members
Brief awareness refreshers for all other employees
Disk to Disk - answerdisk storage has become increasingly inexpensive. With drive
capacities now measured in terabytes, tape and optical media can't cope with data
volume requirements anymore. Many enterprises now use disk-to-disk (D2D) backup
solutions for some portion of their disaster recovery strategy.
Software escrow arrangement - answeris a unique tool used to protect a company
against the failure of a software developer to provide adequate support for its products
or against the possibility that the developer will go out of business and no technical
support will be available for the product.
Remote Mirroring - answerMaintaining a live database server at the backup site. It is the
most advanced database backup solution.
Remote Journaling - answerA database backup type which records at the transaction
level
Electronic vaulting scenario - answerdatabase backups are moved to a remote site
using bulk transfers.
Cold Sites (Disaster recovery): - answerA "recovery" cold site is essentially data center
space, with power, and network connectivity that is available when needed. In the event
of a disaster, teams can move and install a business's hardware at the cold site in order
to get the systems back up and running.