100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

BCS – Basic Contractor Skills REAL EXAM

Beoordeling
-
Verkocht
-
Pagina's
45
Cijfer
A+
Geüpload op
19-11-2025
Geschreven in
2025/2026

Master the Basic Contractor Skills (BCS) exam with this comprehensive study guide. Includes high-yield practice questions, detailed explanations, and essential concepts to help aspiring contractors reinforce skills, boost confidence, and pass the BCS exam.

Meer zien Lees minder











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Documentinformatie

Geüpload op
19 november 2025
Aantal pagina's
45
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Voorbeeld van de inhoud

BCS – Basic Contractor Skills real exam!!




1. Which one of these is not a normal Zoning Regulation?

- Building set backs

- Parking requirements

- Building durability and cost

- Type of allowed building use or activity - ANSWER ✔----Building durability and cost



2. What is the minimum number of points needed to gain a LEED certified rating?

- 60

- 50

- 40

- 80 - ANSWER ✔---- 40



3. The total amount of energy consumed throughout all phases of the material life cycle is
____________?

- Embodied Material

- Embodied Energy

- Embodied Carbon

- Embodied Water - ANSWER ✔----Embodied Energy

,4. A single-purpose entity combines who under one legal contract ?

- The Owner and Contractor

- The Owner, the Architect, the Engineers

- The Architect and the Contractor

- The Owner, entire Design Team, and entire Construction Team - ANSWER ✔---- The Owner, entire
Design Team, and entire Construction Team



5. Who created the Master Format ?

- AISC

- Construction Specification Institute

- American Institute of Architects

- International Code Council - ANSWER ✔----Construction Specification Institute



6. What occupancy classification would be used for a church sanctuary ?

- Assembly

- Institutional

- Educational

- Industrial - ANSWER ✔---- Assembly



7.As a contractor, you will not have influence about design decisions.

-True

-False - ANSWER ✔----False



8. What is left out in the "cradle-to-gate analysis" ?

-Energy used to extract the natural resources

-Energy used to install and maintain the material

-Energy used to manufacture the material

,-Energy used to ship the raw material to the manufacturer - ANSWER ✔----Energy used to install and
maintain the material



9. LEED is governed and enforced by a government agency.

-True

-False - ANSWER ✔----False



10. Fire resistance is listed and categorised by the # of __________.

-buildings

-floors

-minutes

-hours - ANSWER ✔----hours



12. Considering safety or legality are not issues, who should always get final say of any decision being
made during a construction process ?

-Contractor

-Owner

-Architect

-Engineer - ANSWER ✔----Owner



13. Who is responsible for handling all aspects of the building design ?

-Contractor

-Engineer

-Architect

-Manufacturer - ANSWER ✔----Architect



14. What division of the Master Format will concrete be found ?

-05

-03

, -06

-02 - ANSWER ✔----03



15. What type of project delivery method is best suited for a project where a turn key price is
guaranteed to an owner in a bid ?

-None

-Design-Bid-Build

-Design-Build

-Integrated Project Delivery - ANSWER ✔----Design-Bid-Build



16. Which definition most accurately describes the Living Building Challenge ?

-A building will generate 50% of its own energy from on-site renewable resources, consume little fresh
water, and have little net carbon greenhouse gas emissions.

-Create a building that consumes little resources and is very comfortable to live in.

-Annually, a building will generate all its own energy from on-site renewable resources, consume no
fresh water, and have no net carbon greenhouse gas emissions.

-Create a building out of natural, living materials. - ANSWER ✔----Annually, a building will generate
all its own energy from on-site renewable resources, consume no fresh water, and have no net carbon
greenhouse gas emissions.



17. The IBC designates different occupancy classifications. Which one of these is not a classification ?

-Industrial

-Assembly

-Business

-Educational - ANSWER ✔----Industrial



18. What answerwer below best describes a "Cost Plus" payment schedule.

-The owner agrees to pay a contractor a lump sum fee for all costs and services provided.

-A contractor is paid a set price for all costs and work performed.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TUTORWILLIAM NURSING
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
138
Lid sinds
2 jaar
Aantal volgers
55
Documenten
3366
Laatst verkocht
3 dagen geleden
TUTOR WILLIAM

4.8

75 beoordelingen

5
67
4
4
3
1
2
1
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen