• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

P-99 Low Pressure Boiler COF FDNY Newest 2025/2026 Complete 100 Questions And Correct Detailed Answers (Verified Answers) |Brand New Version!!

Document preview thumbnail
Preview 2 out of 10 pages

P-99 Low Pressure Boiler COF FDNY Newest 2025/2026 Complete 100 Questions And Correct Detailed Answers (Verified Answers) |Brand New Version!!

Content preview

P-99 Low Pressure Boiler COF FDNY Newest 2025/2026 Complete Questions And Correct Detailed
Answers (Verified Answers) |Brand New Version!!

A fill line in an oil burner system is a line used to: - (ANSWER)Fill the storage tank with oil.



The aquastat is located - (ANSWER)Below the water line.



All heating, combustion, and cooking equipment shall be installed with adequate clearances from
_______ construction. - (ANSWER)Combustible



The equipment must be provided with ______ or the building construction shall be _____ _____. -
(ANSWER)Insulation.

Fire Protected



During operation the surface of combustible construction materials will not be raised to a temp higher
than _____ degrees F. - (ANSWER)170 degrees



Equipment shall be so that the means of access for ordinary operation and maintenance will not be
_______. - (ANSWER)Hazardous



Acceptance Tests:

Boilers shall not be placed in operation until they have been _____ and ____ and an equipment ____
_____ has been issued by the ______. - (ANSWER)Inspected and tested.

Use permit, commissioner



Periodic Inspections: All boilers must be inspected at least _____ a _____ including chimney
connections. - (ANSWER)Once a year



Owners Annual Statement: The owner of each boiler shall file an _____ written statement with the
________, specifying the _____of each boiler and ______ for inspection. - (ANSWER)Annual,
commissioner, location, arrangement.



Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by the ______ before
the system is operated. - (ANSWER)Hydrostatically, contractor

, P-99 Low Pressure Boiler COF FDNY Newest 2025/2026 Complete Questions And Correct Detailed
Answers (Verified Answers) |Brand New Version!!

The piping shall be tested at _____ times the max working pressure applicable to that part of the piping
system but at a pressure ____ than the test pressure required for the storage tank. - (ANSWER)1/2, less



The min pressure for testing tanks shall be ____ times the max working pressure but in no case less than
____ psi. - (ANSWER)1 1/2, 25 psi



The hydrostatic pressure must be maintained until all ____ and _____ have been visually inspected for
___, but in no case less than _____ hour. - (ANSWER)Joints, connections, leaks, 1/2 hour.



A record must be kept of the pressure test showing the name of the _____ and the _____ at which the
piping and tank were tested. - (ANSWER)Contractor, pressure



Gas piping must be tested by the _____ before operation. - (ANSWER)Contractor



For oil burning systems, ____ ____ giving instructions for the care and operation of the system shall be
permanently located in an easily _____ and _____ location near the equipment. - (ANSWER)Instruction
Cards, visible, accessible



No oil burning equipment shall be operated until an equipment ____ _____ has been issued by the
commissioner, the requirements of the ____ ____ control code have been met and until the approval
for the storage of ____ ____ has been given by the fire commissioner. - (ANSWER)Use permit, air
pollution, fuel oil



Every oil burning installation that is not fully automatic or requires preheating shall be operated under
the direct supervision of a person holding a ____ ___ ______ issued by the FD. - (ANSWER)COF



Such person must be in the building at ____ ____ while in operation and present in the _____ _____
during startup. - (ANSWER)All times, boiler room



After any repairs to the boiler are made, ______ shall check the repairs and the functioning of all ____
_____ and the positioning of the ______. - (ANSWER)Operators, control devices, valves

Document information

Uploaded on
October 31, 2025
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$19.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Avanarriss
4.9
(264)
Sold
1306
Followers
12
Items
1519
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions