CCM Certification
3 Meeting Types in Construction Phase - ANS-pre-creation, development, and special
conferences.
5 C's - ANS-1. Clarity
2. Completeness
3. Constructibility
4. Compliance (with owner's program)
5. Coordination (many of the trades and contractors as appropriate).
Addendum - ANS-A supplement to documents, issued prior to taking receipt of bids, for the
cause of clarifying, correcting, or otherwise converting bid documents formerly issued.
Additional Services - ANS-Services provided similarly to those particularly distinct as primary
services in the settlement among the owner and CM. Also known as supplemental services.
Agency - ANS-A legal dating by which one birthday party (agent) is empowered and obligated to
act on behalf of some other birthday celebration (proprietor).
Agency Construction Management - ANS-shape of production management performed in a
defined courting among the CM and proprietor. The enterprise form of construction control
establishes a specific function of the CM acting as the owner's primary agent in connection with
the mission/application.
Agreement - ANS-A record placing forth the relationships and responsibilities between two
parties, because the CM and owner or contractor and owner. It may additionally incorporate
different files by reference.
An sum of money usually set on a in step with day foundation, which the contractor concurs to
pay the owner for postpone in completing the work according with the contract files. -
ANS-Material or equipment having an prolonged delivery time. Such objects may be taken into
consideration for early procurement and buy under separate settlement to facilitate on time of
completion of the mission.
Apparent Low Bidder - ANS-The bidder who has submitted the lowest bid for a department of
work described in bid files, an offer shape, or proposed settlement.
Approved Bidders List - ANS-The listing of contractors which have been prequalified for the
reason of submitting accountable, competitive bids.
, Approved Changes - ANS-Changes in the agreement files which have been subjected to an
agreed upon change approval process and were accredited by means of the celebration
empowered to approve such adjustments.
As-Built Drawings - ANS-Drawings (plans) that display the paintings as truly mounted. Also
called report drawings.
At-Risk Construction Management - ANS-A transport approach that involves a dedication by the
construction manager to supply the venture for an established amount, often a Guaranteed
Maximum Price (GMP). The creation supervisor acts as a representative to the owner within the
improvement and layout stages. During construction, the CM will anticipate extra obligations
and will undertake construction duties, usually being placed in a felony function similar to that of
a trendy contractor.
Basic Delivery Forms - ANS-1. Traditional Approach or Design-Bid-Build (D-B-B)
2. Multiple-Prime Contracting (Multi-Prime)
three. Construction Management-at-Risk (CM-at-Risk)
4. Design-Build (D-B)
5. Integrated Project Delivery (IPD)
Basic Services - ANS-Scope of service as described in the authentic agreement among the
proprietor and CM as primary services.
Beneficial Occupancy - ANS-The use of the built facility by using the proprietor previous to final
crowning glory of the construction.
Bid - ANS-An offer to perform the work described in agreement documents at a targeted price.
Bid Bond - ANS-A pledge from a surety to pay as much as the bond amount to the owner inside
the event the bidder defaults on its commitment to enter right into a agreement to carry out the
paintings described in the bid documents for the bid rate. The bond is designed to shield the
proprietor for the distinction in fee between the popular bid and the next lowest perfect bid.
Bid Documents - ANS-The documents issued to the contractor(s) with the aid of the owner that
describe the proposed paintings and agreement terms. Bid files usually include drawings,
specs, agreement bureaucracy, general and supplementary widespread situations, thought, or
bid bureaucracy, and other facts.
Biddability - ANS-The degree to which a fixed of bid documents can be fairly predicted to allow
a bidder to establish a aggressive price to carry out the work as defined within the bid files.
Biddability Review - ANS-A formal evaluation of the settlement documents, addendum, and
reference files to be done with recognize to the nearby production market and the bid packaging
3 Meeting Types in Construction Phase - ANS-pre-creation, development, and special
conferences.
5 C's - ANS-1. Clarity
2. Completeness
3. Constructibility
4. Compliance (with owner's program)
5. Coordination (many of the trades and contractors as appropriate).
Addendum - ANS-A supplement to documents, issued prior to taking receipt of bids, for the
cause of clarifying, correcting, or otherwise converting bid documents formerly issued.
Additional Services - ANS-Services provided similarly to those particularly distinct as primary
services in the settlement among the owner and CM. Also known as supplemental services.
Agency - ANS-A legal dating by which one birthday party (agent) is empowered and obligated to
act on behalf of some other birthday celebration (proprietor).
Agency Construction Management - ANS-shape of production management performed in a
defined courting among the CM and proprietor. The enterprise form of construction control
establishes a specific function of the CM acting as the owner's primary agent in connection with
the mission/application.
Agreement - ANS-A record placing forth the relationships and responsibilities between two
parties, because the CM and owner or contractor and owner. It may additionally incorporate
different files by reference.
An sum of money usually set on a in step with day foundation, which the contractor concurs to
pay the owner for postpone in completing the work according with the contract files. -
ANS-Material or equipment having an prolonged delivery time. Such objects may be taken into
consideration for early procurement and buy under separate settlement to facilitate on time of
completion of the mission.
Apparent Low Bidder - ANS-The bidder who has submitted the lowest bid for a department of
work described in bid files, an offer shape, or proposed settlement.
Approved Bidders List - ANS-The listing of contractors which have been prequalified for the
reason of submitting accountable, competitive bids.
, Approved Changes - ANS-Changes in the agreement files which have been subjected to an
agreed upon change approval process and were accredited by means of the celebration
empowered to approve such adjustments.
As-Built Drawings - ANS-Drawings (plans) that display the paintings as truly mounted. Also
called report drawings.
At-Risk Construction Management - ANS-A transport approach that involves a dedication by the
construction manager to supply the venture for an established amount, often a Guaranteed
Maximum Price (GMP). The creation supervisor acts as a representative to the owner within the
improvement and layout stages. During construction, the CM will anticipate extra obligations
and will undertake construction duties, usually being placed in a felony function similar to that of
a trendy contractor.
Basic Delivery Forms - ANS-1. Traditional Approach or Design-Bid-Build (D-B-B)
2. Multiple-Prime Contracting (Multi-Prime)
three. Construction Management-at-Risk (CM-at-Risk)
4. Design-Build (D-B)
5. Integrated Project Delivery (IPD)
Basic Services - ANS-Scope of service as described in the authentic agreement among the
proprietor and CM as primary services.
Beneficial Occupancy - ANS-The use of the built facility by using the proprietor previous to final
crowning glory of the construction.
Bid - ANS-An offer to perform the work described in agreement documents at a targeted price.
Bid Bond - ANS-A pledge from a surety to pay as much as the bond amount to the owner inside
the event the bidder defaults on its commitment to enter right into a agreement to carry out the
paintings described in the bid documents for the bid rate. The bond is designed to shield the
proprietor for the distinction in fee between the popular bid and the next lowest perfect bid.
Bid Documents - ANS-The documents issued to the contractor(s) with the aid of the owner that
describe the proposed paintings and agreement terms. Bid files usually include drawings,
specs, agreement bureaucracy, general and supplementary widespread situations, thought, or
bid bureaucracy, and other facts.
Biddability - ANS-The degree to which a fixed of bid documents can be fairly predicted to allow
a bidder to establish a aggressive price to carry out the work as defined within the bid files.
Biddability Review - ANS-A formal evaluation of the settlement documents, addendum, and
reference files to be done with recognize to the nearby production market and the bid packaging