All project related functions between parties to a contract" is the definition of -
ANSWER-Project Administration
A common method to transport large equipment from one location to another is to use a
lowboy (T/F) - ANSWER-True
A letter of transmittal is: - ANSWER-A dated record of when a document was sent to
another party
A pre-construction conference to establish ground rules for operations and the
successful completion of the project should be held: - ANSWER-During the bid phase
A pre-final inspection: - ANSWER-Generates the initial punch list for the project
A projects LEED certification fee paid to the GBCI is based on which of the following
factors? - ANSWER-Project square footage, USGBC membership status
After an RFI response is received, the general contractor and its subcontractors should
review the change to see if there is a change in scope of work and possible cost or
schedule impacts. (T/F) - ANSWER-True
AHJ stands for: - ANSWER-Authority having Jurisdiction
All submittals must be approved by the project architect/engineer (T/F) - ANSWER-
False
An optimum job site layout plan maximizes on-site labor in material movement travel,
and transportation, allowing workers to spend the minimum amount of time performing
construction activities. (T/F) - ANSWER-False
As discussed in the class, the superintendent is the critical link to the craft workers. He
is responsible for "pushing" the work. (T/F) - ANSWER-False
Coined by Autodesk and popularized by Jerry Laiserin, BIM stands for: - ANSWER-
Building Information modeling
Ethics are a theory or system of values that answers the question, "What can I do and
still not get caught?" (T/F) - ANSWER-False
Functional organizational structures are most common for small to mid-sized
construction companies. (T/F) - ANSWER-True
, In a limited liability partnership (LLP), the profits of the business are subject to double
taxation. - ANSWER-False
In a sole proprietorship, the owner of the business is personally liable for the debts and
action of the business. - ANSWER-True
In a(n) __ contract, quantities are specified and compensation for variance with the
specified quantities may - ANSWER-Unit-price
In prolog, what module would I open in order to complete an RFI? - ANSWER-Doc
Control
In which sector of the construction industry is mobilization referred to as the ongoing
process of moving project material and equipment from one work area to another? -
ANSWER-Heavy highway
Individuals can be LEED Accredited. (T/F) - ANSWER-True
LEED stands of Leadership in Energy and Efficient Design. (T/F) - ANSWER-False.
Leadership in Energy and Environment
Lien releases may be requested from the contractor and all subcontractors. (T/F) -
ANSWER-True
Most contracts specify that the owner can take a period of __ to process progress
payment after receipt of the certified application, but this may vary depending on
specific factors relating to the owner and project financing. - ANSWER-30 days
Most RFI's are: - ANSWER-Brief questions requesting clarification
NTP stands for no time penalty. (T/F) - ANSWER-False
Only the owner, not the A/E, has the authority to accept non-conforming work. (T/F) -
ANSWER-True
Procedures for discovering defects and deficiencies or deviations to the contract
documents before and during the execution of the work is also known as: - ANSWER-
Quality assurance
Productivity is measured in terms of: - ANSWER-Output / Input
Project administration software should NOT include the following features - ANSWER-
Anonymous commenting
Provisional payments are pre-determined partial amount to be paid when certain
identified milestones are achieved (T/F) - ANSWER-True