Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

CTQP Final Estimates Level 1 Questions And Answers | Updated Solutions | 100% Correct Answers

Document preview thumbnail
Preview 3 out of 18 pages

1) A major function of the DOT is to carry out Construction and Reconstruction programs to provide the public with adequate transportation service. True For the DOT, the management of Construction and reconstruction projects involves the following specific responsibilities: A. Planning, Programming and design B. Contract administration C. Contractor payments D. Design and Contract Management E. All of the above E. All of the above 3) To pay for the work performed by Contractors, progress and Final Estimates are needed. True or False? True 8/8/25, 8:27 AM CTQP Final Estimates Level 1 Flashcards | Quizlet These standards are made available for Design, Construction, Maintenance, and Utility operations on the State Highway System. This booklet provides guidelines and technical drawings for design and Construction personnel. SUPPLEMENTAL AGREEMENTS (SA) SA'S are work of a different characteristic from that shown in the original plans and contract; such as to clarify the Specifications, or pay for unforeseen work. WORK ORDERS (WO) WO's are similar to SA's but can't be used in all instances. They are used to include additional work into the original contract, and to do minor changes. JOINT PARTICIPATION AGREEMENTS (JPA) JPA's or Locally Funded Agreements (LFA)'s are part of the State Contract with a separate Financial ID Number. They are legal documents between the Department and other government or private entities. The work would be a utility relocations or installations, etc. 1) Multiple choice. Which of the following is NOT officially considered to be a "Contract Document"? A. Supplemental Agreements and Work Orders. B. Notebooks and Estimates Procedure Manual. C. Standard Specifications. D. Construction Manual. E. Answers B &D E. Answer B & D

Content preview

8/8/25, 8:27 AM CTQP Final Estimates Level 1 Flashcards | Quizlet




CTQP Final Estimates Level 1

Save




Terms in this set (45)


1) A major function of the True
DOT is to carry out
Construction and
Reconstruction programs
to provide the public with
adequate transportation
service.

For the DOT, the E. All of the above
management of
Construction and
reconstruction projects
involves the following
specific responsibilities:
A. Planning, Programming
and design
B. Contract administration
C. Contractor payments
D. Design and Contract
Management
E. All of the above

3) To pay for the work True
performed by
Contractors, progress and
Final Estimates are
needed. True or False?

https://quizlet.com/1064556234/ctqp-final-estimates-level-1-flash-cards/?new 1/18

,8/8/25, 8:27 AM CTQP Final Estimates Level 1 Flashcards | Quizlet


These standards are made available for Design,
Construction, Maintenance, and Utility operations on
DESIGN STANDARDS the State Highway System. This booklet provides
guidelines and technical drawings for design and
Construction personnel.

SA'S are work of a different characteristic from that
SUPPLEMENTAL
shown in the original plans and contract; such as to
AGREEMENTS (SA)
clarify the Specifications, or pay for unforeseen work.

WO's are similar to SA's but can't be used in all
WORK ORDERS (WO) instances. They are used to include additional work
into the original contract, and to do minor changes.

JPA's or Locally Funded Agreements (LFA)'s are part of
the State Contract with a separate Financial ID
JOINT PARTICIPATION Number. They are legal documents between the
AGREEMENTS (JPA) Department and other government or private entities.
The work would be a utility relocations or installations,
etc.

1) Multiple choice. Which E. Answer B & D
of the following is NOT
officially considered to be
a "Contract Document"?
A. Supplemental
Agreements and Work
Orders.
B. Notebooks and
Estimates Procedure
Manual.
C. Standard Specifications.
D. Construction Manual.
E. Answers B &D




https://quizlet.com/1064556234/ctqp-final-estimates-level-1-flash-cards/?new 2/18

, 8/8/25, 8:27 AM CTQP Final Estimates Level 1 Flashcards | Quizlet


2) Multiple choice. B Supplemental Specifications
Between printings of the
Standard Specifications,
what does the
Department publish to
identify and describe
changes in the
Specifications?
A. CPAM
B. Supplemental
Specifications
C. Work orders
D. Specifications Changes




https://quizlet.com/1064556234/ctqp-final-estimates-level-1-flash-cards/?new 3/18

Document information

Uploaded on
August 8, 2025
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
quizletquizizzy
5.0
(1)
Sold
9
Followers
0
Items
517
Last sold
6 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions