100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

CERTIFIED BUILDING OFFICIAL MM MANAGEMENT MODULE STUDY GUIDE WITH ALL CORRECT & 100% VERIFIED ANSWERS|ALREADY GRADED A+

Puntuación
-
Vendido
-
Páginas
5
Grado
A+
Subido en
28-07-2025
Escrito en
2024/2025

CERTIFIED BUILDING OFFICIAL MM MANAGEMENT MODULE STUDY GUIDE WITH ALL CORRECT & 100% VERIFIED ANSWERS|ALREADY GRADED A+

Institución
Building Engineer
Grado
Building engineer









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Building engineer
Grado
Building engineer

Información del documento

Subido en
28 de julio de 2025
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CERTIFIED BUILDING OFFICIAL MM MANAGEMENT
MODULE STUDY GUIDE WITH ALL CORRECT & 100%
VERIFIED ANSWERS|ALREADY GRADED A+
Regardless of the high degree of professionalism attained by members of the building department in
its conduct of things scientific and technical, it will be judged more critically on ____________.
Correct answer-its ability to relate to those they come in contact with

One attribute that a field inspector should possess is problem solving skills. Both the IBC and IRC
contain sections that allow for the approval of alternatives to gain code compliance. One of the best
tools available to an inspector in approving alternative materials and methods is _____________.
Correct answer-utilizing ICC Evaluation Service Reports

Holding pre-construction meetings with all stakeholders is an important part of a __________ in the
construction process and in achieving safe buildings. Correct answer-collaborative effort

One indication of poor time management on the part of an inspector is that the ___________.
Correct answer-inspector's efficiency is less than peers

When making ethical decisions, one measure consists of asking yourself how you feel inside about
the decision, i.e., Am I nervous? Am I losing sleep over this decision? Am I worried someone will find
out? This type of questioning is called ____________. Correct answer-the Butterfly test

Television, radio, newspapers and the internet all help shape ___________. Correct answer-public
opinion

Whose responsibility is it to acquaint the political body with the purpose of the building department
and the need to refrain from becoming involved in the daily operations of the building department?
Correct answer-the building official

Coordination between departments is often inadequate. _________ is a method that provides
solutions to a fractured process. Correct answer-The one-stop-shop process

What agency is charged with the marketing of the municipality and the recruitment of viable
companies that make up the tax base such as owners of commercial real estate? Correct answer-
The chamber of commerce

Performance measures and indicators are used to determine the __________ and __________ of the
staff's work activities. Correct answer-quality, quantity

The challenge in any department seems to be managing _________, such as personal appearance,
manners and communication skills. Correct answer-intangible qualities

Education of the general public in the need for and validity of codes is the greatest weapon against
________ the code enforcement process Correct answer-ignorance of

The best attitude for members of the building safety department to adopt when dealing with a
member of the public is _________. Correct answer-patience

, Code education begins at the highest levels of the organization through policies and __________ of
the building department, which may include public presentations to interested groups. Correct
answer-outreach efforts

CRM software systems are one of the most popular forms of receiving public feedback. What does
CRM stand for? Correct answer-Customer Relationship Management

One method of receiving feedback is working with local newspaper outlets to create a regular
_________ allowing the building official to respond to questions posed by the public Correct
answer-column

The building official is the _________ in charge of the building safety department. As such, they also
serve as the voice and face of the department. It is incumbent on the building official to attend
regular stakeholder association meetings such as the local home builders, building owners and
managers, AIA, etc., in order to receive feedback and have a positive flow of communication.
Correct answer-executive official

Authority for code enforcement is based on _________ granted by the U.S. Constitution. Correct
answer-police power

Building Permit Fees are considered to be a ________. Correct answer-regulatory fee

_________ are usually collected from developers and are used to pay for off-site improvements such
as constructing new arterial roads, extending sewers and storm drainage lines, etc., serving the new
development. Correct answer-Impact fees

The line-item budget collects and reports information on _________ used in the production of
government goods and services Correct answer-resources

One of the first steps to take during the preparation phase of a budget cycle is: Correct answer-
Develop a budget calendar.

_________ generally stipulates a date by which the city or county manager must submit a proposed
budget. Correct answer-Home rule charter

Equipment replacement and building improvements are usually funded from _________. Correct
answer-reserve funds

Performance management, which integrates performance measures into the day-to-day operations
of a program or department usually begins with the development of ___________. Correct
answer-a strategic plan

Accounting information is much more standardized due to __________ as adopted by the
Governmental Accounting Standards Board. Correct answer-generally accepted accounting
principles

In a budget, there are two types of accounts: _________ and _________. Correct answer-
estimated revenues and appropriations

Every financial transaction is recorded into an account then aggregated into _________ reports.
Correct answer-interim financial
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
Stuvia2026

Conoce al vendedor

Seller avatar
Stuvia2026 Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
9
Miembro desde
6 meses
Número de seguidores
0
Documentos
3538
Última venta
3 semanas hace
"Your trusted Hub for Academic Excellence"

Stuvia 2024 is your trusted destination for top-tier study materials, including high-quality exams, assignments, and verified answer keys. Our content is crafted for excellence thorough, up-to-date, and tailored to help students succeed in their academic journey. Whether you're preparing for a final exam or need support with coursework, every document in our store is designed to provide clarity, accuracy, and confidence. At Stuvia 2024, academic success starts with the right resources.

Lee mas Leer menos
0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes