Between Printings of the standard specifications, what does the department publish to
identify and describe changes in the specifications? - Answer-Change Orders
Completed sets of final plans should be: - Answer-Bound together in the order shown
on the key sheet & Submitted to the district with the final estimates package.
Which of the items listed below is NOT included in the Final Estimates package? -
Answer-Density log books
What is placed on the plan sheets to call particular attention to unusual conditions? -
Answer-Plan Notes
What would you use to document field changes in the plans? - Answer-Black ball point
pen & Black pencil
What is the basis for payment of final quantities? - Answer-Site Source records
What software is available for calculation final pa quantities? - Answer-Engineering
Menu
According to the standard weight table, what is the TOTAL weight of the following
quantities of bolts? - Answer-1,472 Ibs
Which of the following documents are used for reviewing contract time charges before
clearing estimates for final payment? - Answer-Construction Diaries
It is usually necessary to measure items, which are to be paid for on a lump sum or
"plan quantity" basis. - Answer-FALSE
On the transmittal letter, how should field books be listed? - Answer-Book number &
description of contents
What is the rea of the sodded section shown below? - Answer-11,241 SY
When a pay item is based on truck capacity and side boards have been added to the
truck body, what should you submit with the final estimates package? - Answer-
Sketches of truck measurements
Examples of site source records include: - Answer-Field books, tally sheets asphalt
reports, latitude & department
EXAM Q&A
Between Printings of the standard specifications, what does the department publish to
identify and describe changes in the specifications? - Answer-Change Orders
Completed sets of final plans should be: - Answer-Bound together in the order shown
on the key sheet & Submitted to the district with the final estimates package.
Which of the items listed below is NOT included in the Final Estimates package? -
Answer-Density log books
What is placed on the plan sheets to call particular attention to unusual conditions? -
Answer-Plan Notes
What would you use to document field changes in the plans? - Answer-Black ball point
pen & Black pencil
What is the basis for payment of final quantities? - Answer-Site Source records
What software is available for calculation final pa quantities? - Answer-Engineering
Menu
According to the standard weight table, what is the TOTAL weight of the following
quantities of bolts? - Answer-1,472 Ibs
Which of the following documents are used for reviewing contract time charges before
clearing estimates for final payment? - Answer-Construction Diaries
It is usually necessary to measure items, which are to be paid for on a lump sum or
"plan quantity" basis. - Answer-FALSE
On the transmittal letter, how should field books be listed? - Answer-Book number &
description of contents
What is the rea of the sodded section shown below? - Answer-11,241 SY
When a pay item is based on truck capacity and side boards have been added to the
truck body, what should you submit with the final estimates package? - Answer-
Sketches of truck measurements
Examples of site source records include: - Answer-Field books, tally sheets asphalt
reports, latitude & department