100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

FDOT FINAL ESTIMATES - LEVEL 1 EXAM Q&A

Rating
-
Sold
-
Pages
4
Uploaded on
06-07-2025
Written in
2024/2025

FDOT FINAL ESTIMATES - LEVEL 1 EXAM Q&A

Institution
FDOT
Course
FDOT








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT
Course
FDOT

Document information

Uploaded on
July 6, 2025
Number of pages
4
Written in
2024/2025
Type
Exam (elaborations)
Contains
Unknown

Subjects

Content preview

FDOT FINAL ESTIMATES - LEVEL 1
EXAM Q&A
Between Printings of the standard specifications, what does the department publish to
identify and describe changes in the specifications? - Answer-Change Orders

Completed sets of final plans should be: - Answer-Bound together in the order shown
on the key sheet & Submitted to the district with the final estimates package.

Which of the items listed below is NOT included in the Final Estimates package? -
Answer-Density log books

What is placed on the plan sheets to call particular attention to unusual conditions? -
Answer-Plan Notes

What would you use to document field changes in the plans? - Answer-Black ball point
pen & Black pencil

What is the basis for payment of final quantities? - Answer-Site Source records

What software is available for calculation final pa quantities? - Answer-Engineering
Menu

According to the standard weight table, what is the TOTAL weight of the following
quantities of bolts? - Answer-1,472 Ibs

Which of the following documents are used for reviewing contract time charges before
clearing estimates for final payment? - Answer-Construction Diaries

It is usually necessary to measure items, which are to be paid for on a lump sum or
"plan quantity" basis. - Answer-FALSE

On the transmittal letter, how should field books be listed? - Answer-Book number &
description of contents

What is the rea of the sodded section shown below? - Answer-11,241 SY

When a pay item is based on truck capacity and side boards have been added to the
truck body, what should you submit with the final estimates package? - Answer-
Sketches of truck measurements

Examples of site source records include: - Answer-Field books, tally sheets asphalt
reports, latitude & department

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
biggdreamer Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
250
Member since
2 year
Number of followers
68
Documents
18071
Last sold
1 week ago

4.0

38 reviews

5
22
4
4
3
6
2
2
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions