Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

APA Precast Concrete Batch Plant Operator Questions And Answers

Document preview thumbnail
Preview 2 out of 5 pages

APA Precast Concrete Batch Plant Operator Questions And Answers

Content preview

APA Precast Concrete Batch Plant Operator
Questions And Answers




(True or False) Fine aggregates are those materials that are retained on a No. 4 sieve.

• True
• False ...ANSWER...False

With how many strokes should you rod each layer of concrete placed in the
compressive strength TEST MOLD?

• 10
• 15
• 20
• 25 ...ANSWER...25

(True or False) The major factor controlling the durability of concrete is its strength.

• True
• False ...ANSWER...True

How is laitance produced in concrete?

• Water collects under the surface of the CEMENT
• Cement is hydrated with saltwater
• Cement is hydrated with minimum water
• Cement is hydrated with excess water ...ANSWER...Cement is hydrated with excess
water

What percent do water reducing admixtures usually reduce the required water content
for a concrete mixture?

• 1% to 2% only
• 1% to 3%
• 3% to 7%

, • 5% to 10% ...ANSWER...5% to 10%

Concrete is denser and stronger when which condition is met?

• All voids are filled
• Voids are large and unfilled
• Aggregate particles are not solidly BONDED
• Aggregate particles are not coated with a cement-water paste ...ANSWER...All voids
are filled

Before using warehouse-packed cement, what should you do to make it free of lumps?

• Restack the sacks to allow air to circulate around them
• Raise the temperature where the sacks are stored
• Roll the sacks around
• Cover the sacks for 48 hours with tarpaulins ...ANSWER...Roll the sacks around

You are conducting a slump test. Which result indicates a poor mix?

• The concrete mix crumbles
• The concrete mix segregates
• The concrete mix falls apart
• All of the above ...ANSWER...All of the above

(True or False) Concrete has high ability to resist stretching, bending, and twisting.

• True
• False ...ANSWER...False

What is the main reason to store cement in a dry place?

• To prevent it from becoming concrete while in storage
• To prevent it from setting too fast and producing weak concrete
• To prevent it from setting too slowly and producing weak concrete
• To avoid warehouse pack ...ANSWER...To prevent it from setting too slowly and
producing weak concrete

To calculate the number of cubic yards required for a pad, divide the cubic feet of the
pad by what number?

• 27
• 28
• 30
• 40 ...ANSWER...27

Document information

Uploaded on
June 1, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Lectcaptain
5.0
(1)
Sold
4
Followers
0
Items
1002
Last sold
3 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions