100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

IRC TEST FULL EXAM ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!! 2025

Rating
3.5
(2)
Sold
5
Pages
76
Grade
A+
Uploaded on
12-04-2025
Written in
2024/2025

IRC TEST FULL EXAM ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!! 2025

Institution
IRC
Course
IRC











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
IRC
Course
IRC

Document information

Uploaded on
April 12, 2025
Number of pages
76
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

IRC TEST FULL EXAM ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS
(VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!! 2025

The International Residential Code is applicable to single-family dwellings a maximum of
_______________ stories in above-grade-plane height.

A. One

B. Two

C. Three

D. Four - (ANSWER)C
@#$%%$
)(*&^
#$%^
If there is a conflict in the code between a general requirement and a specific requirement,
the _______________ requirement shall apply.
@#$%^&
A. General
*(*&^%
B. Specific

C. Least restrictive

D. Most restrictive - (ANSWER)B



Provisions of the appendices do not apply unless _______________.

A. Specified in the code

B. Applicable to unique conditions

C. Specifically adopted

D. Relevant to fire or life safety - (ANSWER)C



_______________ is the term used in the IRC to describe the individual in charge of the
department of building safety.

A. Building official

B. Code official

C. Code administrator

D. Chief building inspector - (ANSWER)A

, IRC TEST FULL EXAM ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS
(VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!! 2025

The building official has the authority to _______________ the provisions of the code.

A. Ignore

B. Waive

C. Violate

D. Interpret - (ANSWER)D


@#$%%$
Used materials may be utilized under which one of the following conditions? )(*&^
#$%^
A. They meet the requirements for new materials

B. When approved by the building official @#$%^&
C. Used materials may never be used in new construction *(*&^%

D. A representative sampling is tested for compliance - (ANSWER)B



The building official has the authority to grant modifications to the code _______________.

A. for only those issues not affecting life safety or fire safety

B. for individual cases where the strict letter of the code is impractical

C. where the intent and purpose of the code cannot be met

D. related only to administrative functions - (ANSWER)B



Unless supporting a surcharge, retaining walls having a maximum height of __________
inches, measured from the bottom of the footing to the top of the wall, do not require a
permit.

A. 30

B. 36

C. 48

D. 60 - (ANSWER)C

, IRC TEST FULL EXAM ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS
(VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!! 2025

Tests performed by _______________ may be required by the building official where there is
insufficient evidence of code compliance.

A. The owner

B. The contractor

C. An approved agency

D. A design professional - (ANSWER)C
@#$%%$
)(*&^
#$%^
A permit is not required for the construction of a one-story detached accessory structure
when it has a maximum floor area of _______________ square feet.
@#$%^&
A. 100
*(*&^%
B. 120

C. 150

D. 200 - (ANSWER)D



Prefabricated swimming pools are subject to a building permit where they have a minimum
depth of _______________ .

A. 12 inches

B. 24 inches

C. 30 inches

D. 36 inches - (ANSWER)B



Unless an extension is authorized, a permit becomes invalid when work does not
commence within _______________ after permit issuance.

A. 90 days

B. 180 days

C. one year

D. two years - (ANSWER)B

, IRC TEST FULL EXAM ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS
(VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!! 2025



The building permit, or a copy of the permit, shall be kept _______________ until completion
of the project.

A. At the job site

B. By the permit applicant

C. By the contractor

D. By the owner - (ANSWER)A @#$%%$
)(*&^
#$%^


When a building permit is issued, the construction documents shall be approved
@#$%^&
_______________.
*(*&^%
A. In writing or by stamp

B. And two sets returned to the applicant

C. And stamped as "Accepted as Reviewed"

D. Pending payment of the plan review fee - (ANSWER)A



Unless otherwise mandated by state or local laws, the approved construction documents
shall be retained by the building official for a minimum of _______________ from the date of
completion of the permitted work.

A. 90 days

B. 180 days

C. one year

D. two years - (ANSWER)B



Where applicable, which one of the following inspections is not specifically identified by
the International Residential Code as a required inspection?

A. Foundation inspection

B. Frame inspection

Reviews from verified buyers

Showing all 2 reviews
2 months ago

The code article is not listed.

5 months ago

3.5

2 reviews

5
1
4
0
3
0
2
1
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QuickFixer Self
View profile
Follow You need to be logged in order to follow users or courses
Sold
2064
Member since
2 year
Number of followers
7
Documents
1182
Last sold
3 weeks ago

3.6

18 reviews

5
6
4
3
3
6
2
1
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions