What are the inputs to the Manage Quality Process - correct answer 1. Project Management plan (Quality management plan), 2. Project documents )Lessons learned register, Quality control measurements, quality metrics, risk report), 3. OPA Tool used to Manage Quality Process - correct answer 1. Data gathering (checklist), 2. Data analysis (document analysis, process analysis, alternative analysis, root cause analysis), 3. Decision making (multi-criteria decision analysis), 4. Data representation (affinity diagrams, cause-and-effect-diagrams, flowcharts, histograms, matrix diagrams, scatter diagrams), 5. Audits, 6. Design for X, 7. Problem solving, 8. Quality improvement methods Root Cause Analysis - correct answer An analytical technique used to determine the basic underlying reason that causes a variance or a defect or a risk. A root cause may underlie more than one variance or defect or risk. 6 steps of root cause analysis? - correct answer 1. Identify an issue and define problem, 2. collect data (troubled), 3. analysis for patterns, 4. check for process gaps/review gaps, 5. Identify root cause, 7. Update process. Outputs of the Manage Quality Process - correct answer 1. Quality reports, 2. Test and evaluation documents, 4. Project management plan updates (quality management plan, scope baseline, schedule baseline, cost baseline), 4. change request, 5. Project documents updates (issue log, lessons learned register, risk register) Inputs for Controlling Quality Process - correct answer 1. Project management plan (quality management plan), 2. Project documents (Lessons learned register, quality metrics, test and evaluation documents), 3. Approved change requests, 4. Deliverables, 5. Work Performance data, 6. Enterprise environmental factors, 7. OPAs What are the tools used in the Controlling Quality Process? - correct answer 1. Data gathering (checklist, check sheets, statistical sampling, questionnaires and surveys), 2. Data analysis (performance reviews, root cause analysis), 3. Inspection, 4. Testing/product evaluations, 5. Data representation (cause-and-effect diagrams, control charts, histograms, scatter diagrams), 6. Meetings (retrospective, approve change requests review) Outputs of the Control Process - correct answer 1. Quality control measurements, 2. Verified deliverables, 3. Work Performance information, 4. Change requests, 5. Project management plan updates (quality management plan), 6. Project documents updates ( Issue logs, lessons learned register, test and evaluation documents) Pareto Diagram - correct answer A histogram, ordered by frequency of occurrence, that shows how many results were generated by each identified cause. Based on Pareto Principle Pareto Principle (80/20 rule) - correct answer An observation that for many events, roughly 80 percent of the effects come from 20 percent of the causes. Pareto Diagram 6 steps - correct answer 1. Develop a list of causes or error types to be compared, 2. Record frequencies, 3. rank the top six in descending order, 4. find cumulative % for each of the causes responsible,5. chart and draw line Control Chart - correct answer A graphic display of process data over time and against established control limits, which has a centerline that assists in detecting a trend of plotted values toward either control limit. Upper Control Limit (UCL) - correct answer A line in a control chart that provides the largest value that is still acceptable without being labeled an abnormal variation. Lower Control Limit (LCL) - correct answer a line in a control chart that provides the smallest value that is still acceptable without being labeled an abnormal variation Rule 7 - correct answer If seven consecutive samples (quality) fall above/below mean toward the UCL or LCL (enter root cause analysis) Ishikawa diagram or Fishbone Diagram - correct answer Tool used in root cause analysis Common Cause Variation - correct answer The source of variation in a process that is inherent within the process

Content preview

Manage and Control Quality

What are the inputs to the Manage Quality Process - correct answer 1. Project
Management plan (Quality management plan), 2. Project documents )Lessons learned register, Quality
control measurements, quality metrics, risk report), 3. OPA



Tool used to Manage Quality Process - correct answer 1. Data gathering (checklist),
2. Data analysis (document analysis, process analysis, alternative analysis, root cause analysis), 3.
Decision making (multi-criteria decision analysis), 4. Data representation (affinity diagrams, cause-and-
effect-diagrams, flowcharts, histograms, matrix diagrams, scatter diagrams), 5. Audits, 6. Design for X, 7.
Problem solving, 8. Quality improvement methods



Root Cause Analysis - correct answer An analytical technique used to determine the
basic underlying reason that causes a variance or a defect or a risk. A root cause may underlie more than
one variance or defect or risk.



6 steps of root cause analysis? - correct answer 1. Identify an issue and define
problem, 2. collect data (troubled), 3. analysis for patterns, 4. check for process gaps/review gaps, 5.
Identify root cause, 7. Update process.



Outputs of the Manage Quality Process - correct answer 1. Quality reports, 2. Test
and evaluation documents, 4. Project management plan updates (quality management plan, scope
baseline, schedule baseline, cost baseline), 4. change request, 5. Project documents updates (issue log,
lessons learned register, risk register)



Inputs for Controlling Quality Process - correct answer 1. Project management plan
(quality management plan), 2. Project documents (Lessons learned register, quality metrics, test and
evaluation documents), 3. Approved change requests, 4. Deliverables, 5. Work Performance data, 6.
Enterprise environmental factors, 7. OPAs



What are the tools used in the Controlling Quality Process? - correct answer 1. Data
gathering (checklist, check sheets, statistical sampling, questionnaires and surveys), 2. Data analysis
(performance reviews, root cause analysis), 3. Inspection, 4. Testing/product evaluations, 5. Data
representation (cause-and-effect diagrams, control charts, histograms, scatter diagrams), 6. Meetings
(retrospective, approve change requests review)

Document information

Uploaded on
April 8, 2025
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
RealGrades
4.0
(26)
Sold
201
Followers
52
Items
12414
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions