Your installation is refurbishing an existing PES facility built in 1968. Do you need to complete
an ESSP? - Answer✔Yes, and it requires DDESB approval.
As distance from the potential explosion site decreases, the potential for damage to an exposed
site from an explosion.... - Answer✔increases.
Your installation is increasing the NEW for a storage site built in 1969 and storing a hazard
division that was not previously approved for that location. Do you need to complete an ESSP? -
Answer✔Yes, and it requires DDESB approval.
Intraline distance (ILD) is the minimum distance permitted between... - Answer✔two operating
buildings.
The purpose of an ESSP is to ensure safety, provide specifications, and... - Answer✔establish
limits.
You must submit an ESSP for DDESB approval if the installation is... - Answer✔building an ES
within an existing ESQD arc.
Failing to submit a successful ESSP may result in... - Answer✔reduced operational capacity.