• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

Permit Technician Practice Exam

Document preview thumbnail
Preview 2 out of 5 pages

Permit Technician Practice Exam

Content preview

Permit Technician Practice Exam

Approved construction documents shall be retained by the Building Department for no less than
________ from the date of completion of permitted work. - ANSWER-180 days

Uses that were illegally established prior to the adoption of the local zoning code shall: - ANSWER-
remain illegal

When local government has acted beyond the scope of its powers it is known as _____ - ANSWER-
ultra vires

An official inspection report should contain which of the following: - ANSWER-Clear references to the
code section and violation written in everyday language.

Which of the following is not necessary in taking down a complaint? - ANSWER-Name, address, phone
of violator

Which of the following documents should not be accepted by a building department? - ANSWER-
Unsigned written app from either owner or authorized agent.

What is the most important documents that a code official and building department have to
determine what the building contractor is doing on site? - ANSWER-Building permit and application
for building permit.

An elevation certificate is required for ____ - ANSWER-Lowest floor level area in the flood hazard area.

A CofO does not need to contain ____ - ANSWER-Zoning permit number and date of issuance.

It shall be the duty of the holder of the ______ or their authorized agent to notify the building official
when work is ready for inspection. - ANSWER-Building Permit.

Which of the following would not be issued a CofO as a use B? - ANSWER-Drug Store.

A zoning approval shall expire ______ if the use or activity is not established. - ANSWER-180 days

A 4.5" line at 3/4" = 1'0" equals - ANSWER-6.25ft

In design, review and construction, the ______ view shows the proposed construction as if it were
being viewed by air. - ANSWER-Plan (Site plan)

A site plan for a proposed building should not contain______ - ANSWER-Location of structures of
adjacent properties.

Construction documents submitted with a permit application for commercial construction shall be? -
ANSWER-Prepared by a registered design professional.

A permit application shall be considered abandoned after _____ days past the date of filing if not
pursued in good faith. The building official may grant multiple extensions, if required in writing, for
periods not exceeding ______ days each. - ANSWER-180

The international building code shall apply to all but which of the following. - ANSWER-Residential;
three story town homes.

, The architectural symbol BRG stands for? - ANSWER-bearing

A standard in building code only becomes law to the extent which it is ______ in a model. - ANSWER-
referenced

The zoning ordinance map must show the ______ - ANSWER-District boundaries.

Who assumes responsibility for issuing building permits? - ANSWER-Building official.

The building code does not permit an appeal based on which of the following? - ANSWER-Full
compliance would cause a hardship.

One of the primary reasons for requiring a building permit is to ______. - ANSWER-Verify compliance
with minimum construction standards.

Which of the following would not be considered one of the size typical parts of a building permit? -
ANSWER-Census bureau's copy.

A building permit is ______. - ANSWER-A license to build.

Which of the following is not generally part of the four-step process when drafting a zoning ordinance?
- ANSWER-Hold a general election to adopt the zoning ordinance.

The Standard Zoning Enabling Act was established by the US Department of Commerce in ______. -
ANSWER-1924

Zoning ordinances must include provisions for nonconforming uses, which are ____. - ANSWER-Uses
that existed before the zoning ordinance was in effect.

Typically, when there is a conflict between the building zone and the zoning ordinance, the ______ is
enforced. - ANSWER-Most stringent requirement.

An easing of the terms of the zoning ordinance is known as a ______. - ANSWER-Variance.

The two parts of a zoning ordinance are ____ and _____. - ANSWER-A map and the text.

Which of the following is not considered a benefit of a zoning code? - ANSWER-Establishes maximum
speed regulations in residential districts.

An area or district in a city or town under special restrictions to the types of buildings that may be
erected is known as a ______. - ANSWER-Zone.

ICC's square foot construction costs table is based on. - ANSWER-Type of construction and occupancy
group.

Which of the following is not typically a function of a building department? - ANSWER-Prohibit
specific construction methods and materials.

Permit and plan review fees are collected to ______. - ANSWER-Offset the cost of departmental
operations.

Which of the following is not under the authority of the building official? - ANSWER-Grant variances.

All of the following are typically considered one of the three major zoning districts except ____. -
ANSWER-Entertainment.

Document information

Uploaded on
April 2, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AndrewBenson
3.3
(3)
Sold
30
Followers
0
Items
2204
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions