The 1970s law that set into place the regulation of stormwater is correct answers The clean water
act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation correct answers NPDES
Which of the following is never an allowable stormwater discharge from a construction site
correct answers Discharge from contaminated ground water
The notice of termination can be filed when correct answers All construction activity, inside and
outside of the building, is complete and permanent stabilization has been verified as adequate to
meet permit requirements
Relative to stormwater permitting all of the following must occur before construction starts
except correct answers Submit the notice of termination (NOT)
The stormwater notice of intent (NOI) must be submitted correct answers After the SWPPP is
prepared and before starting construction
Potential pollutant sources stored on a construction site may include correct answers 1.
Petroleum storage tanks
2. Soil sediments
3. Masonary material
4. ALL OF THE ABOVE
The SWPPP inflammation sequence may be modified correct answers After consulting with the
project SWPPP Designer (CEC) and, if required, the project owner and receiving written
approval
A SWPPP site map will show all of the following except correct answers Notices of violation
Which of the following information is to be posted at the entrance of the site correct answers 1.
Construction site notice
2. Permit authorization
3. Location of SWPP
4. ALL OF THE ABOVE
Which of the following is NOT A beneficial use of water correct answers Flushing a spill down a
storm drain
When installing and maintaining a check dam make sure correct answers The low point
(overflow) of the check dam is in the middle of the channel
, To reduce the possibility of undercutting in channels, you should correct answers Install filter
fabric under rock and similar materials placed within the stormwater conveyance
The good housekeeping section of the SWPP must include all BUT which of the following
correct answers Post construction stormwater management procedures
Runoff controls include all but which of the following correct answers Rolled erosion control
products
Which erosion control best management practice increases water filtration, dissipates rainfall
energy and slows over flow of stormwater correct answers Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most control
over (only select one) is correct answers Groundcover
Temporary stabilization should be implemented correct answers Immediately on all disturbed
areas that are likely to or will remain inactive for 14-days or more
The primary purpose of a construction exit is correct answers To remove sediment from
construction site vehicles and minimize trackout
Common types of erosion include all of the following except correct answers Sedimentation
Proper spill management should include all of the following EXCEPT correct answers
Installation of a spill pit on your construction site
The best location for portable toilets on your construction site is correct answers On ground
level, in low construction traffic areas
The following must be marked on site maps in the job site trailer as work progresses correct
answers The dates when BMP changes or additions take place
While inspecting field BMP's the SWPPP inspector should perform all of the following EXCEPT
correct answers Assume BMP's are in good condition from a distance
If your site is inspected by US EPA, or another regulatory agency, you should: correct answers 1.
Be courteous
2. Attend their inspection
3. Allow access to sight and documentation
4. ALL OF THE ABOVE
What must be done before I can give a worker a badge and access to the site correct answers
Look at the WV form and attached list, verify the workers name is on the list and look at the
workers current I.D.