TESTING PROCEDURES QUESTIONS
WITH 100% SOLVED ANSWERS!!
1 of 40
Definition
The total layout shall be straight, without kinks or twists
Give this one a try later!
Shall appliance be used while Total length of any hose line being
performing the test tested shall not exceed
, All hose in service shall be tested
how often Hose layout during testing
Don't know?
2 of 40
Term
Which side of apparatus shall hose be connected to
Give this one a try later!
Attach hose to the top of the apparatus.
Leave hose disconnected from the apparatus.
Attach hose to the off-side of the apparatus.
With black tape at the location(s) where repairs are needed. The hose shall
immediately be taken out of service and sent to Supply and Maintenance for
repair or replacement.
Don't know?
3 of 40
Term
, The pressure shall be raised at a rate not greater than_____per
second until the service test pressure is reached.
Give this one a try later!
30 psi 10 psi
25 psi 15 psi
Don't know?
4 of 40
Term
Duration of test
Give this one a try later!
three minutes at the maximum
pressure. one minute at a variable pressure.
five minutes at the
ten minutes at a lower pressure. required
pressure.
Don't know?
5 of 40