• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 1 pages
Exam (elaborations)

PJM Generator Operator ACE 100% Verified

Document preview thumbnail
Preview 1 out of 1 pages

Area Control Error (ACE) - ANSWER A measure of the imbalance between sources of power and uses of power within the PJM RTO. The instantaneous difference between a Balancing Authority's net actual and scheduled interchange, taking into account the effects of Frequency Bias, correction for meter error, and Automatic Time Error Correction (ATEC), if operating in the ATEC mode. The sign convention for power flow used at PJM is _________ for power flow into PJM; the NERC sign convention is power flow into a balancing area is ________. - ANSWER Positive; Negative Flat Tie Line Control - ANSWER Utilizes

Content preview

PJM Generator Operator ACE 100%
Verified
Area Control Error (ACE) - ANSWER A measure of the imbalance between sources of
power and uses of power within the PJM RTO. The instantaneous difference between a
Balancing Authority's net actual and scheduled interchange, taking into account the
effects of Frequency Bias, correction for meter error, and Automatic Time Error
Correction (ATEC), if operating in the ATEC mode.

The sign convention for power flow used at PJM is _________ for power flow into PJM;
the NERC sign convention is power flow into a balancing area is ________. - ANSWER
Positive; Negative
Flat Tie Line Control - ANSWER Utilizes only interconnection tie line flow as the
controlling parameter; only responds to net tie flow deviations; limited to special
circumstances when PJM Balancing Area desires to maintain a given net interchange
flow and frequency is stabled and being controlled by other Balancing Areas

Tie Line Bias Control - ANSWER Responds to both frequency and net tie line flow
deviations

There are three modes of ACE Control available to PJM dispatcher for the operation of
the PJM RTO. - ANSWER Flat Frequency Control; Flat Tie Line Control; Tie Line Bias
Control

Flat Frequency Control - ANSWER Utilizes only power system frequency as the
controlling parameter; only responds to frequency deviations and does not adjust
operations for any interconnection tie line schedule deviations; only applicable when
PJM Balancing area becomes isolated from the Easter Interconnection


The frequency bias factor for the PJM RTO is set by Interconnection Agreement that is
at least 1% of the yearly peak value and accomplishes: - ANSWER -compensates for
automatic governor action so ACE does not "undo" changes in generator output due to
frequency fluctuations; compensates for any lack of PJM governor response by
calculating an ACE that produces the PJM RTO's agreed upon share of frequency
support to the Easter Interconnection

Document information

Uploaded on
January 22, 2025
Number of pages
1
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lecchris
3.8
(6)
Sold
43
Followers
15
Items
3198
Last sold
3 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions