Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 3 pages
Exam (elaborations)

CADE Storm Water Compliance Construction- Walmart CADE Exam Guide with Complete Solutions

Document preview thumbnail
Preview 1 out of 3 pages

CADE Storm Water Compliance Construction- Walmart CADE Exam Guide with Complete SolutionsCADE Storm Water Compliance Construction- Walmart CADE Exam Guide with Complete SolutionsCADE Storm Water Compliance Construction- Walmart CADE Exam Guide with Complete SolutionsThe Clean Water Act - ANSWER-The 1970's law that set into place the regulation of storm water NPDES - ANSWER-Requirements for managing storm water activity on a construction site are outlined in the following regulation Discharge From Contaminated Ground Water - ANSWER-Never an allowable discharge from a construction site

Content preview

CADE Storm Water Compliance
Construction- Walmart CADE Exam
Guide with Complete Solutions

The Clean Water Act - ANSWER-The 1970's law that set into place the regulation of
storm water


NPDES - ANSWER-Requirements for managing storm water activity on a construction
site are outlined in the following regulation


Discharge From Contaminated Ground Water - ANSWER-Never an allowable discharge
from a construction site


A notice of termination can be filed when? - ANSWER-All construction activity, inside
and outside of the building is complete. Permanent stabilization has been verified.


The storm water notice of intent must be submitted? - ANSWER-After the SWPPP is
prepared and before starting construction.


Potential pollutant sources stored on a construction site may include? - ANSWER-
Petroleum storage tanks, fertilizer, lime, and masonry materials.


Which erosion control best management practice increases water infiltration, dissipates
rainfall energy, and slows overland flow of storm water? - ANSWER-Vegetation


The contractor has the most control over what erosion rate factor? - ANSWER-
Groundcover

Document information

Uploaded on
October 24, 2024
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NursingTutor1
3.9
(459)
Sold
1698
Followers
1073
Items
18441
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions