Construction- Walmart CADE Exam
Guide with Complete Solutions
The Clean Water Act - ANSWER-The 1970's law that set into place the regulation of
storm water
NPDES - ANSWER-Requirements for managing storm water activity on a construction
site are outlined in the following regulation
Discharge From Contaminated Ground Water - ANSWER-Never an allowable discharge
from a construction site
A notice of termination can be filed when? - ANSWER-All construction activity, inside
and outside of the building is complete. Permanent stabilization has been verified.
The storm water notice of intent must be submitted? - ANSWER-After the SWPPP is
prepared and before starting construction.
Potential pollutant sources stored on a construction site may include? - ANSWER-
Petroleum storage tanks, fertilizer, lime, and masonry materials.
Which erosion control best management practice increases water infiltration, dissipates
rainfall energy, and slows overland flow of storm water? - ANSWER-Vegetation
The contractor has the most control over what erosion rate factor? - ANSWER-
Groundcover